欢迎访问《金属矿山》杂志官方网站,今天是 分享到:

金属矿山 ›› 2009, Vol. 39 ›› Issue (03): 107-110+115.

• 机电与自动化 • 上一篇    下一篇

应用Micromine软件实现矿山井巷工程的可视化管理

梁涛1,2,卢仁3,Warren Woodhouse2,张四维2,吴璠2,刘明月2   

  1. 1.中国地质大学地质过程与矿产资源国家重点实验室;2.河北华澳矿业开发有限公司蔡家营锌矿;3.中国科学院地球化学研究所
  • 出版日期:2009-03-14 发布日期:2012-01-30
  • 基金资助:

    * 家科学技术部公益性行业科研项目(编号:200811020)。

Visualized Management of Mine Underground Developments by Micromine

Liang Tao1,2,Lu Ren3,Warren Woodhouse2,Zhang Siwei2,Wu Fan2,Liu Mingyue2   

  1. 1.China University of Geosciences ;2.Hebei Huaao Mining Industry Co., Ltd.;3.Institute of Geochemistry, Chinese Academy of Sciences
  • Online:2009-03-14 Published:2012-01-30

摘要: 井巷工程工作面的可视化管理对矿山安全生产和品位控制具有重要的意义。从井巷工程施工设计说明中提取相关参数并结合地质编录数据建立了满足井巷工程工作面实时监控所需的数学模型,使用Excel完成数学模型的计算求解过程和建立包含施工进展和地质特征等信息的井巷工程工作面数据表格。基于所获得数据运用Micromine矿山软件建立蔡家营锌矿井巷工程工作面施工进展的地质数据库,结合Micromine软件中可视化功能实现井巷工程工作面的可视化管理。井巷工程的工作面样品及其硐壁采样都可应用Micromine钻孔数据库进行管理,可结合钻探样品对仅基于钻探样品构建的矿块模型(block model)进行局部修正,进而能获得比较逼真的矿块模型。

关键词: 蔡家营, 数学模型, 可视化, Micromine, Excel

Abstract: Visualized management of the faces of underground developments is of great significance to the safety and grade control in daily mining activities.A mathematical model for real-time monitoring of faces of underground developments is established based on the designed parameters of underground drives and daily geologic logging.Excel is employed to calculate the results of the mathematic model, and set up the data sheets related to developments and geological features.A geological database is set up and used to complete visualized management by using Micromine software.Face samples and wall samples of underground developments can be treated as drillhole samples in Micromine, these two types of drillhole databases combined with the exploration drills database can be used to locally modify the block model only constrained by exploration drill database, and a more real block model can thus be achieved.

Key words: Caijiaying, Mathematic model, Visualization, Micromine, Excel