欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2017, Vol. 46 ›› Issue (10): 99-104.

• 国际矿山测量学术论坛专栏 • 上一篇    下一篇

建筑物下压煤条带煤柱巷柱式加固技术及应用

戴华阳1,廖孟光2,田秀国3   

  1. 1.中国矿业大学(北京)地球科学与测绘工程学院,北京 100083;2.湖南科技大学地理空间信息技术国家地方联合工程实验室,湖南 湘潭 411201;3.开滦集团有限责任公司,河北 唐山 063000
  • 出版日期:2017-10-15 发布日期:2017-10-15
  • 基金资助:

    国家自然科学基金项目(编号:51574242),国家自然科学基金青年科学基金项目(编号:51604108)。

Study on Coal Pillar Reinforcement Methods and Application of Strip Mining under the Buildings

Dai Huayang1,Liao Mengguang1,2,Tian Xiuguo3   

  1. 1.China.College of Geo-science and Surveying Engineering,China University of Mining and Technology (Beijing),Beijing 100083,China.;2.National-Local Joint Engineering Laboratory of Geo-spatial Information Technology,Hunan University of Science and Technology,Xiangtan 411201,China;3.Kailuan Group,Co.,Ltd,Tangshan 063000,China
  • Online:2017-10-15 Published:2017-10-15

摘要: 为了提高条带开采的采出率,可采取巷柱式加固煤柱、减小留宽的方法。通过数值模拟分析,揭示了巷柱式条带煤柱可以优化条带开采方案和煤柱加固方案,研究结果表明煤柱加固能减少留设煤柱的宽度,提高条带开采采出率。结合国内某矿特殊的地质采矿条件和巷柱式煤柱加固思想,在试验区采用拱棚木垛联合加固技术,木垛与棚架组成的巷柱式加固宽度1.5 m,间距2 m。通过井下煤柱位移监测和地表变形监测数据分析可知,井下巷柱式加固体最大竖向位移为361 mm,地表最大下沉值217 mm。煤柱加固有效地防止煤壁的破坏,地表变形得到了一定的控制,确保了建(构)筑物的安全使用。因此,巷柱式煤柱加固思想能为建筑物下采煤提供重要的途径和借鉴。

关键词: 开采沉陷, 条带开采, 巷柱式煤柱加固, 拱棚木垛联合加固技术, 监测数据

Abstract: In order to improve the extraction rate of strip mining,the method of coal pillar reinforcement and reducing the width of pillar is proposed.By analyzing numerical simulation,it is revealed that the strip coal pillar can optimize the strip mining and the coal pillar reinforcement.The results show that the coal pillar reinforcement can reduce the width of remaining coal pillar and improve recovery rate of strip mining.Combined with special geological and mining conditions of a certain coal mine in China and the thought of coal pillar reinforcement with roadway shores,the joint reinforcement technology of shed and wood crib was used in the test area with the width and interval of reinforcement bodies composed of shed and wood crib 1.5 m and 2m separately.Analysis on data of the underground displacement monitoring of coal pillar and the surface settlement monitoring indicated that the maximum vertical displacement of underground pillar reinforcement body is 361 mm,and the maximum subsidence of surface is 217 mm.Coal pillar reinforcement can effectively prevent from the destruction of the coal wall,control ground surface deformation,and ensure the safety of the building.So,the thought of coal pillar reinforcement with roadway shore can provide important way and reference for coal mining under buildings.

Key words: Mining subsidence, Strip mining, Coal pillar reinforcement with roadway shores, Joint reinforcement technology of shed and wood crib, Monitoring data