欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2018, Vol. 47 ›› Issue (01): 47-52.

• 采矿工程 • 上一篇    下一篇

斜槽盖板形式对尾矿库排洪系统泄流能力的影响

陈雯   

  1. 四川西冶工程设计咨询有限公司,四川 成都 610051
  • 出版日期:2018-01-15 发布日期:2018-03-13

Influence of Chute Cover Form on Discharge Capacity of Flood Drainage System in Tailings Pond

Chen Wen   

  1. Sichuan Southwest metallurgy Engineering Consultants,Inc.Chengdu,610051,China
  • Online:2018-01-15 Published:2018-03-13

摘要: 斜槽是尾矿库常见进水构筑物,为优化斜槽断面,实现充分泄流,以某斜槽式排洪系统为模型,用控制变量法来分析盖板拱角、调洪水深对排洪系统泄流能力的影响。结果表明:拱角与泄流能力存在最优关系,同调洪水深,泄流流态均为堰流,拱角与泄流量线性单调递减;均为半压流,二者线性单调递增;流态混合,二者呈开口向下的曲线关系。拱角与盖下堰流、半压流流量增速呈单调线性关系,与盖上堰流流量增速呈开口向下的曲线关系。拱角对泄流流态的影响为:拱角越小,随调洪水深增大,流态从堰流向半压流转换越快,拱角大于某值后,流态直接由盖下堰流转为半压流,无盖上堰流阶段。最后阐述了拱角-泄流能力关系在斜槽断面优化设计中的运用思路。

关键词: 尾矿库, 排洪系统, 斜槽, 盖板形式, 流态, 调洪演算, 泄流关系曲线

Abstract: Chute-type drainage facility is a common flood discharge facility for tailings pond.In order to optimize the chute section to achieve full discharge,a chute type drainage system is considered as a model to analyze the effects of cover arch angle and water depth on the flood discharge capacity of the drainage system by the control variable method.The results show that there exists an optimal relationship between arch angle and discharge capacity.Under the same water depth,and in the weir flow state of the discharge,both of the arch angle and the discharge volume have a linear monotone decreasing relationship.In semi-pressure flow state,both have a linear monotonically increasing.In the mixed flow state,both diplay as a curvilinear regression of shedding downward.Impact of arch angle on the flow pattern showed that:the smaller arch angle,the faster the flow state shifts from weir flow to semi pressure flow as the water depth increasing.When the arch angle is greater than a certain value,the flow state is directly transferred to the semi pressure flow from the weir flow below the cover without the state of weir flow above the cover.These relationships between arch angle and the discharge capacity can be applied to the optimization of the chute section.

Key words: Tailings pond, Flood discharge system, Chute, Chute cover form, Flow state, Flood routing, Leakage flow curve