超深预裂孔底部加强装药高度试验研究

崔正荣1,2,张西良1,2,潘祖瑛1,2,李龙福1,2   

  1. 1. 中钢集团马鞍山矿山研究院有限公司,安徽,马鞍山 243000;2. 马鞍山矿山研究院爆破工程有限责任公司,安徽,马鞍山243000
  • 出版日期:2018-12-15 发布日期:2019-01-17

Experimental Research on Strengthening Charge Height at the Bottom of Super Deep Pre-splitting Hole

Cui Zhengrong1,2,Zhang Xiliang1,2,Pan Zuying1,2,Li Longfu1,2   

  1. 1. Sinosteel Maanshan Institute of Mining Research Co., Ltd.,Maanshan 243000, China;2. Maanshan Institute of Mining Research Blasting Engineering Co., Ltd., Maanshan 243000, China
  • Online:2018-12-15 Published:2019-01-17

摘要: 本次研究以传统预裂爆破技术为基础,以西北某露天铁矿并段超深孔预裂爆破项目为背景,在工程实例的基础上提出了超深孔底部加强装药公式,即底部加强装药高度L1取值范围0.1 L~0.2 L,其中L[∈]15,30)为孔深,m。以底部加强装药的超深孔预裂爆破参数设计为基础,运用ANSYS/LS-DYNA数值模拟软件进行数值模拟,对比模拟结果,分析底部加强药区域部分节点应力场分布以及压力峰值。结果表明底部加强药高度为4~4.5 m时预裂爆破效果最好。提出了底部加强装药高度L1取值范围0.15 L~0.17 L。并进行了现场试验,试验效果均较理想,底部成缝效果较好,证明了超深预裂孔底部加强装药技术可行,有效地指导了矿山生产。

关键词: 超深孔预裂爆破, 底部加强装药, 数值模拟, 现场试验

Abstract: Based on the traditional pre-splitting blasting technology and taking the super deep hole pre- splitting blasting project of a certain iron ore in Northwest of China as the background, the formula of strengthening charge at the bottom of the ultra deep hole is put forward on the basis of engineering practice, that is, the height of the bottom strengthening charge is 0.1 L≤L1≤0.2 L, and the depth of L[∈]15, 30) in the formula is the hole depth. Based on the parameters design of the super deep hole pre-splitting blasting at the bottom, ANSYS/LS-DYNA numerical simulation software is used to simulate the stress field distribution and the peak pressure. The results show that the pre splitting blasting effect is best when the bottom strengthening charge is at 4 m~4.5 m. It is put forward that strengthening the bottom charge height L1 ranges at 0.15 L≤L1≤0.17 L. The field tests have been carried out, and the test results are all ideal and the bottom slit effect is good. It is proved that the strengthening charge technology at the bottom of the ultra deep pre-splitting hole is feasible and can effectively guide the mine production.

Key words: Super deep hole pre-splitting blasting, Strengthening charge at the bottom, Numerical simulation, Field test