真实地形下尾矿库溃坝尾砂流下泄过程数值模拟

刘晓峰1,2 廖宗文2,3 肖利兴1,2 姚 池2,3
  

  1. 1. 中国瑞林工程技术股份有限公司,江西 南昌 330031;2. 江西省尾矿库工程安全重点实验室,江西 南昌 330031;3. 南昌大学建筑工程学院,江西 南昌 330031
  • 出版日期:2023-09-15 发布日期:2023-11-03
  • 基金资助:
    国家自然科学基金项目(编号:51879127);江西省自然科学基金项目(编号:20192ACB20020)。

Numerical Simulation of Tailings Flow Discharge Process of Tailings Dam Break in Real Terrain

LIU Xiaofeng1,2 LIAO Zongwen2,3 XIAO Lixing1,2 YAO Chi2,3 #br#   

  1. 1. China Ruilin Engineering Technology Co. ,Ltd. ,Nanchang 330031,China;2. Jiangxi Key Laboratory of Tailings Reservoir Engineering Safety,Nanchang 330031,China;3. School of Architecture and Engineering,Nanchang University,Nanchang 330031,China
  • Online:2023-09-15 Published:2023-11-03

摘要: 为了研究尾矿库溃坝尾砂流对下游敏感目标的影响,以江西省某尾矿库为研究对象,建立了真实三维 地形数值模型,利用 FLOW-3D 三维流体力学软件模拟分析了该尾矿库分别在不同工况下溃坝下泄尾砂流在下游 1 km 范围内的输移时空变化特征。 结果表明:溃坝尾砂流的发展方向、分布情况、水深以及泥沙淤积受真实三维地形 变化影响较为明显,溃坝尾砂流主要分布于下游稻田和低洼地段,浅溪河作为主要行洪通道,水深变化和泥沙淤积情 况较为明显,只有已搬离的浅溪村受到尾砂流淹没,洪水最远到达港口村西部鱼塘,其余村庄均未受到影响。 所得结 果可以为尾矿库安全运行管理和制定溃坝应急预案提供依据。

关键词: 尾矿库, FLOW-3D, 溃坝, 真实地形, 数值模拟

Abstract: In order to study the influence of tailings flow caused by dam break on downstream sensitive targets,a real three-dimensional terrain numerical model was established for a overhead tailings pond in Jiangxi Province. The FLOW-3D three-dimensional hydrodynamics software was used to simulate the temporal and spatial changes of tailings flow in the downstream 1km range under different working conditions. The results show that:the development direction,distribution,water depth and sediment deposition of dam break tailings flow are obviously affected by the real three-dimensional terrain changes. The dam break tailings flow mainly distributes in the downstream paddy fields and low-lying areas. As the main flood passage, Qianxi River has obvious water depth changes and sediment deposition. Only the removed Qianxi Village is submerged by the tailings flow,as far as the fish pond in the west of Gangkou Village,the other villages were not affected. The results can provide the basis for the safe operation management of tailings pond and the formulation of dam break emergency plan.

Key words: tailings pond,FLOW-3D,dam break,real terrain,numerical simulation