沉陷区河堤边采边复治理方式下的动态填方量预计方法

李思豪1 查剑锋1 关 杰2 张 民3   

  1. 1. 中国矿业大学环境与测绘学院,江苏 徐州 221116;2. 皖北煤电集团有限责任公司五沟煤矿,安徽 淮北 235131; 3. 兖矿能源集团股份有限公司杨村煤矿,山东 济宁 272118
  • 出版日期:2024-02-15 发布日期:2024-04-03
  • 基金资助:
    国家自然科学基金联合基金重点项目(编号:U21A20109)

Dynamic Estimation Method of River Embankment Filling of Concurrent Mining and Reclamation in Subsidence Area

LI Sihao1 ZHA Jianfeng1 GUAN Jie2 ZHANG Min3   

  1. 1. School of Environment Science and Spatial Informatics,China University of Mining and Technology,Xuzhou 221116,China; 2. Wugou Coal Mine,Wanbei Coal and Electricity Group Co. ,Ltd. ,Huaibei 235131,China; 3. Yangcun Coal Mine,Yankuang Energy Group Co. ,Ltd. ,Jining 272118,China
  • Online:2024-02-15 Published:2024-04-03

摘要: 煤矿开采引起的河堤变形与破坏显著降低了其防洪安全性能。“先破坏、后治理”的传统处理方式存在 修复滞后、防汛压力大的问题,具有较大的安全隐患,甚至诱发溃坝、洪水等重大公共安全事故。边采边复,及时恢复 河堤的防洪能力是解决这一问题的主要技术途径。基于矿山开采沉陷动态过程特征,提出了沉陷区河堤边采边复的 设计流程;构建了河堤治理过程中的动态填方量计算模型,并应用于某矿地表河流的河堤采动损害治理工程中。研 究结果表明:采用边采边复的治理方式对沉陷区河堤进行治理,可以降低在采动过程中的河水外溢风险,同时减轻了 采动损害对河堤的破坏程度;提出的动态填方量预计方法可实现对河堤各治理阶段土方量的准确预计,能够满足实 际工程需求,为河堤治理工程设计提供了依据。

关键词: 边采边复 概率积分法 开采沉陷预计 河堤治理

Abstract: The deformation and destruction of river embankment caused by coal mining significantly reduce its flood control safety performance. The traditional treatment method of " first destroy and then treat" has the problems of delayed repair and heavy flood control pressure,which has great potential safety hazards and even induces dam break,flood and other major public safety accidents. The main technical way to solve this problem is to restore the flood control capacity of the river embankment in time while mining. Based on the dynamic process characteristics of mining subsidence,this paper presents the design process of concurrent mining and reclamation of the river embankment in subsidence areas;the calculation model of dynamic fill volume in the process of river embankment treatment is constructed and applied to a treatment project about the river embankment suffered the mining damage. The results show that the risk of river overflow in the process of mining can be reduced, and the damage degree of the river embankment caused by mining damage can be alleviated by using the method of concurrent mining and reclamation to restore the river embankment in the subsidence area;the proposed method of dynamic fill volume prediction can accurately predict the earthwork volume in each treatment stage of embankment treatment,meet the actual engineering needs,and provide a basis for the design of embankment treatment engineering.

Key words: concurrent mining and reclamation,probability integral method,mining subsidence prediction,embankment remediation