欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2025, Vol. 54 ›› Issue (7): 8-15.

• 采矿工程 • 上一篇    下一篇

房式空区预充填复采矿柱稳定性研究 

任振群1   张羽者2   李  林1   侯玉亭1   张英超1   黄  鹏2    

  1. 1. 兖矿能源集团股份有限公司南屯煤矿,山东 邹城 273515; 2. 中国矿业大学煤炭资源与安全开采国家重点实验室,江苏 徐州 221116
  • 出版日期:2025-07-15 发布日期:2025-08-12
  • 通讯作者: 黄  鹏(1988—),男,副教授,博士(后),博士研究生导师。
  • 作者简介:任振群(1979—),男,矿长,高级工程师。
  • 基金资助:
    国家自然科学基金青年基金项目(编号:52104105)

Study on the Stability of Pre-backfilling and Remining Pillar in Room Goaf 

REN Zhenqun 1   ZHANG Yuzhe 2   LI Lin 1   HOU Yuting 1   ZHANG Yingchao 1   HUANG Peng   

  1. 1. Nantun Coal Mine,Yankuang Energy Group Corporation Limited,Zoucheng 273515,China; 2. State Key Laboratory of Coal Resources and Safe Mining,China University of Mining and Technology,Xuzhou 221116,China
  • Online:2025-07-15 Published:2025-08-12

摘要: 矿山房式空区受限于采区矿柱分布不明、矿柱稳定性难控制等因素,大量遗留矿产资源滞留在井下,不 仅造成资源浪费,同时可能诱发空区失稳灾害。 山东某矿拟对早期遗留房式矿柱开展复采工作,提出预充填空区、布 置综采工作面矿产资源回收方法;据此建立了矿柱极限强度校核数值模型,得到了原始状态、充填加固时矿柱的稳定 性判别公式,2 种情况下的矿柱极限强度均随高宽比增大呈非线性降低趋势;基于 CAD 软件绘制了空区矿柱实际赋 存形态,导入 MIDAS NX 软件构建了非规则矿柱预充填复采数值模型,研究了综采工作面不同推进距离的矿柱稳定 性。 结果表明:未充填情况下工作面推进 120 m 后,靠近工作面的矿柱陆续破坏;充填情况下,所有矿柱弹性核区应力 减小,所受载荷均未达到极限强度。 研究结果验证了胶结预充填回收矿山房式矿柱方法的可行性,对于回收呆滞资 源具有一定的参考意义。 

关键词: 非规则矿柱  回归拟合  稳定性  数值模拟

Abstract: The mine room goaf is limited by the unknown distribution of pillars in the mining area,the stability of mine pillars is difficult to control and other factors,a large number of mineral resources remain underground,which not only causes a waste of resources,but also may induce roof dynamic disasters. A mine in Shandong plans to carry out re-mining of the early left room pillar,and puts forward the method of pre-backfilling goaf and arranging fully mechanized mining face to recover mine resources. Therefore,a numerical model for checking the ultimate strength of mine pillar is established. The stability discrimination formula of mine pillar in the original state and the backfilling reinforcement is obtained. In both cases,the ultimate strength of mine pillar decreases nonlinearly with the increase of aspect ratio. The actual occurrence form of mine pillar in goaf is drawn based on CAD software,and the numerical model of pre-backfilling and re-mining of irregular pillar is constructed by introducing MIDAS NX software to study the stability of mine pillar and stope pressure of fully mechanized coal face with different advancing distances. The results show that when the working face is advanced to 120 m,the mine pillar near the working face is destroyed one after another,while in the case of backfilling,the stress in the elastic core area of all mine pillars decreases and the load does not reach the ultimate strength. The study results verify the feasibility of the method of recovering mine room pillars by cemented prefilling,which has certain reference significance for the recovery of idle resources. 

Key words: irregular ore pillar,regression fitting,stability,numerical simulation 

中图分类号: