金属矿山 ›› 2026, Vol. 55 ›› Issue (1): 171-177.

• 矿山爆破 • 上一篇    

相邻隧道爆破振动时空演化与安全阈值研究

王鑫尧1 傅家钰1 刘殿柱2 王 春3   

  1. 1. 辽宁工业大学土木建筑工程学院,辽宁 锦州 121001;2. 北京辰安科技股份有限公司,北京 100094;
    3. 山西冶金岩土工程勘察有限公司,山西 太原 030002
  • 出版日期:2026-01-15 发布日期:2026-02-24
  • 作者简介:王鑫尧(1987—),男,讲师,博士,硕士研究生导师。
  • 基金资助:
    辽宁工业大学博士科研启动基金项目(编号:XB2022022)。

Study on the Spatiotemporal Evolution and Safety Threshold of Blasting Vibration in Adjacent Tunnels

WANG Xinyao1 FU Jiayu1 LIU Dianzhu2 WANG Chun3   

  1. 1. School of Civil and Architectural Engineering,Liaoning University of Technology,Jinzhou 121001,China;2. Beijing Chenan Technology
    Co. ,Ltd. ,Beijing 100094,China;3. Shanxi Metallurgical Geotechnical Engineering Survey Co. ,Ltd. ,Taiyuan 030002,China
  • Online:2026-01-15 Published:2026-02-24

摘要: 探究多因素作用下相邻隧道爆破开挖的振动时空演化特征及保障围岩稳定性的安全振动速度阈值,对
于更准确地预测和控制爆破振动,以及提高隧道施工的安全性和高效性具有重要意义。依托八达岭长城站进站层设
备硐室爆破开挖现场实测振动数据,通过VMD-WT 降噪、振动速度频谱分析和数值计算方法研究了相邻隧道不同部
位的振动时空演化特征,并通过建立峰值振动速度与应力峰值关系确定了安全振动速度阈值。结果表明:背爆侧的
振动速度普遍小于迎爆侧,且迎爆侧拱腰处的峰值振动速度最大;在相同的纵向距离(12. 5 m)条件下,迎爆侧拱腰处
峰值振动速度(2. 29 cm/ s)约为迎爆侧拱肩处峰值振动速度(1. 12 cm/ s)的2 倍。采用VMD-WT 方法对现场实测数
据中含有噪声的爆破振动信号进行分解,经过滤波并进行HHT 变换后,得出迎爆侧的能量衰减速度普遍慢于背爆侧,
迎爆侧拱腰处的能量优势频带主要分布在41~100 Hz。最后基于最大拉应力理论得到确保围岩稳定性安全振动速度
阈值为16. 925 cm/ s,即最大等效应力不超过1. 1 MPa 时围岩不会发生破坏。研究结果对于类似工程中控制爆破振动
效应及保障施工安全具有一定的参考意义。

关键词: 相邻隧道 电子雷管 爆破振动 安全振动速度 VMD-WT

Abstract: Exploring the spatiotemporal evolution characteristics of vibration during adjacent tunnel blasting excavation
under multiple factors and the safety vibration velocity threshold to ensure the stability of surrounding rock is of great significance
for more accurate prediction and control of blasting vibration,as well as improving the safety and efficiency of tunnel construction.
Based on the measured vibration data of the equipment chamber blasting excavation site at the entrance level of the
Badaling Great Wall Station,the vibration spatiotemporal evolution characteristics of different parts of adjacent tunnels were
studied through VMD-WT noise reduction,vibration velocity spectrum analysis,and numerical calculation methods. The safety
vibration velocity threshold was determined by establishing the relationship between peak vibration velocity and stress peak.
The results show that the vibration velocity on the back explosion side is generally lower than that on the front explosion side,
and the maximum vibration speed occurs at the arch waist on the front side;Under the same longitudinal distance (12. 5 m),
the peak vibration velocity at the arch waist on the blasting side (2. 29 cm/ s) is approximately twice that at the arch shoulder
on the blasting side (1. 12 cm/ s). Decomposition of blasting vibration signals containing noise in on-site measured data using
VMD-WT joint processing method,filtering and performing HHT transformation,it was found that the energy attenuation rate on
the approaching side was generally slower than that on the back side,and the energy dominant frequency band at the arch waist
of the approaching side was mainly distributed between 41~100 Hz. Finally,based on the maximum tension theory,the safe vibration
velocity threshold for ensuring the stability of surrounding rock is 16. 92 cm/ s,which means that the surrounding rock
will not be damaged when the maximum equivalent stress does not exceed 1. 1 MPa. This has certain guiding significance for
controlling blasting vibration effects and ensuring construction safety in similar projects.

Key words: adjacent tunnels,electronic detonators,blasting vibration,safety vibration velocity,VMD-WT