金属矿山 ›› 2026, Vol. 55 ›› Issue (4): 168-176.

• 矿山爆破 • 上一篇    下一篇

平行空孔直眼掏槽爆破孔间合理延期研究

楼晓明1,2 陶 益1,2 解叶龙3 胡 艳3   

  1. 1. 福州大学紫金地质与矿业学院,福建 福州 350116;2. 福州大学爆炸技术研究所,福建 福州 350108;
    3. 中昌核工(福建)建设发展有限公司,福建 南平 353200
  • 出版日期:2026-04-15 发布日期:2026-05-09
  • 作者简介:楼晓明(1972—),男,教授,博士,硕士研究生导师。
  • 基金资助:
    国家自然科学基金项目(编号:52109124)。

Study on Reasonable Delay Between Holes of Parallel Empty Hole Straight Hole Cut Blasting

LOU Xiaoming1,2 TAO Yi1,2 XIE Yelong3 HU Yan3   

  1. 1. Zijin School of Geology and Mining,Fuzhou University,Fuzhou 350116,China;2. Institute of Explosive Technology,Fuzhou University, Fuzhou 350108,China;3. Zhongchang Nuclear Industry(Fujian) Construction and Development Co. ,Ltd. ,Nanping 353200,China
  • Online:2026-04-15 Published:2026-05-09

摘要: 巷道掘进单自由面掏槽爆破为关键。为探究直眼掏槽爆破延期时间计算方法,首先以现场爆破参数并
结合爆破槽腔形成过程建立岩石碎块抛掷的三维物理模型;然后在分析抛掷动阻力基础上,基于一维运动学和气固
两相流理论,推导出槽腔中岩石碎块不同位置与抛掷初速度的关系、槽腔形成时间,从而确定延期时间;最后通过
SPH-FEM 耦合法数值模拟与以工程现场为背景设计的相似模型试验,分析不同延期时间对爆破效果的影响。研究表
明:掏槽孔起爆后,在爆生气体膨胀压力下使岩石碎块产生抛掷初速度,决定槽腔内岩石碎块抛掷形成槽腔的时间。
在槽腔不同位置岩石碎块速度可通过爆生气体膨胀时间计算,且距离掌子面越近,岩石碎块初始抛掷速度越大;延期
时间的设定与槽腔形成时间紧密联系,理论计算确定每米掏槽孔间最佳延期时间为15~28 ms,数值分析与相似模型
试验结果表明工程现场每米掏槽孔间最佳延期时间为15~22 ms,研究结果对直眼掏槽爆破延期时间选取提供一定参
考依据。

关键词: 掏槽爆破 , 延期时间 , 炮孔利用率 , 抛掷规律 , 爆破试验

Abstract: The single free face cutting blasting in roadway excavation is the key. In order to explore the calculation method
of delay time of straight-hole cutting blasting,a three-dimensional physical model of rock fragment throwing was established
based on the field blasting parameters and the formation process of blasting cavity. Then,based on the analysis of the dynamic
resistance of the throwing,based on the one-dimensional kinematics and gas-solid two-phase flow theory,the relationship between
the different positions of the rock fragments in the groove cavity and the initial velocity of the throwing,the formation time
of the groove cavity,and the delay time are derived. Finally,the influence of different delay time on blasting effect is analyzed
by SPH-FEM coupling numerical simulation and similar model test designed on the background of engineering site. The research
shows that after the blasting of the cut hole,the initial velocity of the rock fragment is generated under the expansion
pressure of the detonation gas,which determines the time for the rock fragment to be thrown into the cavity. The velocity of rock
fragments at different positions in the cavity can be calculated by the expansion time of explosive gas,and the closer to the face
of the tunnel,the greater the initial throwing velocity of rock fragments. The setting of delay time is closely related to the formation
time of the cavity. The theoretical calculation results show that the optimal delay time between the cut holes per meter is 15
~28 ms. The results of numerical analysis and similar model test show that the optimal delay time between the cut holes per
meter in the engineering site is 15~22 ms. The research results provide a certain reference for the selection of delay time of
straight cut blasting.

Key words: cut blasting,extension time,utilization rate of blast holes,throwing pattern,blast experiment