欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2026, Vol. 55 ›› Issue (10): 124-131.

• • 上一篇    下一篇

破碎矿体下向分段充填假顶稳定性与优化研究

许景炎1,2 ,吴爱祥1,2,3 ,阮竹恩1,2,3 ,程国祥3 ,刘 均1,4   

  1. 1.北京科技大学资源与安全工程学院,北京 100083;2.金属矿膏体充填安全绿色开采国家矿山安全监察局 重点实验室,北京 100083;3.镍钴共伴生资源开发与综合利用全国重点实验室,甘肃 金昌 737104; 4.金属矿山高效开采与安全教育部重点实验室,北京 100083)
  • 出版日期:2026-11-03 发布日期:2026-11-09
  • 通讯作者: 阮竹恩(1989—),男,教授,博士。
  • 作者简介:许景炎(1999—),男,硕士研究生。
  • 基金资助:
    地球深部探测与矿产资源勘查国家科技重大专项(编号:2024ZD1003707);中央高校基本科研业务费专项资金资助项目(编号:FRF BD-26-060)。

Study on Stability and Optimization of Sublevel Downward Filling False Roof of Broken Ore Body

XU Jingyan1,2 ,WU Aixiang1,2,3 ,RUAN Zhuen1,2,3 ,CHENG Guoxiang3 ,LIU Jun1,4   

  1. 1.School of Resources and Security Engineering,University of Science and Technology Beijing,Beijing 100083,China;2.Key Laboratory of Safe and Green Mining of Metal Mines with Cemented Paste Backfill,National Mine Safety Administration,Beijing 100083,China; 3.National Key Laboratory of Ni&Co Associated Minerals Resources Development and Comprehensive Utilization,Jinchang 737104,China; 4.Key Laboratory of the Ministry of Education of China for Highefficient Mining and Safety of Metal Mines,Beijing 100083,China
  • Online:2026-11-03 Published:2026-11-09

摘要: 充填假顶能够有效防止采场上部过早垮塌,避免对作业人员和设备造成伤害,同时还能提高资源的回 收率,因此对充填假顶稳定性的分析与优化研究至关重要。利用正交试验设计三因素四水平的16种方案(不同承载 层厚度、不同承载层强度、不同接顶层强度),采用FLAC3D软件结合SPSS对多种方案下的充填假顶稳定性进行分析; 并建立AHPCRITIC组合赋权法的综合评价体系模型,针对安全、经济两大指标确定最优充填体参数。研究表明:最大 拉应力受接顶层充填体强度影响最大,承载层厚度次之,然后是承载层强度。从方差分析来看,接顶层强度对于采场 稳定性有极显著影响,承载层厚度对采场稳定性有显著影响,承载层强度在塑性区体积方面不具有显著性影响。使 用了综合评价体系优选出了充填假顶承载层厚度2 m、承载层强度4 MPa、接顶层强度2.5 MPa的充填体参数方案。 研究对相似矿山在构筑安全经济的充填假顶过程中具有指导意义。

关键词: 充填假顶 , 破碎矿体 , 下向分段充填采矿法 , 数值模拟 , 稳定性分析

Abstract: Filling false roof can effectively prevent premature collapse of the upper part of the stope,avoid damage to workers and equipment,and improve the recovery rate of resources.Therefore,it is very important to analyze and optimize the stability of filling false roof.In this paper,16 schemes of three factors and four levels ( different thickness of bearing layer,dif ferent strength of bearing layer and different strength of top layer) are designed by orthogonal experiment.FLAC3D software combined with SPSS is used to analyze the stability of filling false roof under various schemes.The comprehensive evaluation system model of AHPCRITIC combination weighting method is established,and the optimal filling body parameters are deter mined for the two major indicators of safety and economy.The results show that the maximum tensile stress is most affected by the strength of the top filling body,followed by the thickness of the bearing layer,and then the strength of the bearing layer. From the analysis of variance,the strength of the top layer has a very significant effect on the stability of the stope,the thick ness of the bearing layer has a significant effect on the stability of the stope,and the strength of the bearing layer has no signifi cant effect on the volume of the plastic zone.The comprehensive evaluation system was used to optimize the filling body param eter scheme with the thickness of the bearing layer of the filling false roof 2 m,the strength of the bearing layer 4 MPa,and the strength of the top layer 2.5 MPa.This has guiding significance for similar mines in the process of building a safe and economi cal filling false roof.

Key words: filling false roof,broken orebody,sublevel downward filling mining method,numerical simulation,stability analysis

中图分类号: