金属矿山 ›› 2009, Vol. 39 ›› Issue (10): 32-34+44.

• 采矿工程 • 上一篇    下一篇

不同采矿方案顶柱围岩三维稳定性分析

南世卿   

  1. 石人沟铁矿
  • 出版日期:2009-10-15 发布日期:2011-04-26
  • 基金资助:

    “十一五”国家科技支撑计划项目(编号:2006BAB02A03)。

Three-dimensional Stability Analysis on Pillar Wall Rocks for Different Mining Scheme

Nan Shiqing   

  1. Shirengou Iron Mine
  • Online:2009-10-15 Published:2011-04-26

摘要: 露天转地下开采矿山地下首采中段安全顶住厚度确定是矿山的关键技术问题,采用MSC.Patran和MSC.Nastran三维可视化计算软件,对不同顶柱厚度采矿方案顶柱围岩稳定性进行了分析。矿山可根据沿走向不同剖面上围岩条件确定不同的顶柱厚度的采矿方案。

关键词: 采矿方案, 顶柱围岩, 稳定性分析, 三维可视化

Abstract: The determination of safe pillar's thickness in the middle section of the first mining for transferring to underground mining from open pit is the key technical issue for mine.With MSC.Patran and MSC.Nastran three-dimensional visualization computing software,the stability of pillar wall rocks by different mining programs with different thickness was analyzed.Mine can determine the mining program with different pillar's thickness based on conditions of top wall rocks for different section along the strike.

Key words: Mining scheme, Pillar wall rocks, Stability analysis, Three-dimensional visualization