欢迎访问《金属矿山》杂志官方网站,今天是 分享到:

金属矿山 ›› 2008, Vol. 38 ›› Issue (9): 57-62+72.

• 矿物工程 • 上一篇    下一篇

提高东鞍山烧结厂强磁选作业处理能力的工业试验

宋保莹,栾玲,袁立宾,杨会利   

  1. 鞍钢集团矿业公司东鞍山烧结厂
  • 收稿日期:2008-07-25 出版日期:2008-09-15 发布日期:2011-07-14

Industrial Tests on Improving High Intensity Magnetic Separation Capacity of Donganshan Sintering Plant

Song Baoying,Luan Ling,Yuan Libing,Yang Huili   

  1. Donganshan Sintering Plant of Mining Co.,of AnSteel Group
  • Received:2008-07-25 Online:2008-09-15 Published:2011-07-14

摘要: 分析了东鞍山烧结厂一选车间工艺流程存在的问题,介绍了其正常矿和一般赤铁矿磁选作业处理能力工业试验情况。在分析工业试验结果的基础上,进行了浮选闭路试验,并提出了加强提高东鞍山烧结厂强磁选作业处理能力的建议。

关键词: 强磁选, 磁性矿, 浮选

Abstract: The existing problems of the technical process of No.1 Concentration Workshop of Donganshan Sintering Plant were analyzed and the industrial tests on the capacity of high intensity magnetic separation for general ores and common hematite ores described . Based on the analysis of the industrial test results,tests on the closed circuit flotation were carried out and suggestions on increasing the high intensity magnetic separation capacity of Donganshan Sintering Plant were made.

Key words: High intensity magnetic separation, Magnetic ores, Flotation