[1] |
ZHAO Jianan, LIU Chonghao, QIU Jiwei, SU Hongliang, CUI Yongchun, ZENG Fanjie.
Chronological Characteristics and Prospecting Regularity of Ore-controlling Fault Activities in Uranium
Mines in Northern Guangdong Province:Take the Nanxiong Fault Belt as an Example
[J]. Metal Mine, 2024, 53(3): 158-.
|
[2] |
LIU Yanyan, ZHAO Feng, FU Boxuan, YANG Xiaoming, QI Yuefeng, .
Intelligent Monitoring System of Mining Bulk Material Yard Stacker Reclaimer Based on Digital Twin
[J]. Metal Mine, 2024, 53(01): 132-138.
|
[3] |
LI Pingfeng, LI Dacai SHEN Weifeng.
Development and Engineering Application of Intelligent On-site Mixed Emulsion Explosive Truck
[J]. Metal Mine, 2024, 53(01): 116-123.
|
[4] |
GU Qinghua, SUN Wenjing, LI Xuexian.
Fault Diagnosis of Mining Excavator Engine Based on IFOA-RotGBM
[J]. Metal Mine, 2023, 52(09): 156-163.
|
[5] |
LEI Xianquan, LIU Fuchun TANG Huadong XIONG Youwei LIU Enyan.
Characteristics of Geological Structure and Its Ore-controlling Role in Shanzhou-Mianchi-Xin’an Bauxite Metallogenic Belt, Western Henan Province
[J]. Metal Mine, 2021, 50(11): 142-150.
|
[6] |
ZOU Guanghua ZHANG Chao TIAN Duo SHI Haoyu ZHAO Qifeng YAO Xin DENG Yi.
Study on the Formation Mechanism of Water Conducting Channel of Overburden Strata Crossing Fault Group in Fully Mechanized Caving Face
[J]. Metal Mine, 2021, 50(05): 65-70.
|
[7] |
Pang Qinggang, Che Defu, Jia Qingren.
Three-dimensional Geological Modeling of Stratum Based on Multi-scale CSRBFs
[J]. Metal Mine, 2020, 49(07): 155-160.
|
[8] |
Cai-An-Jiang, LI Tao, WANG Hong-Bo, TIAN Feng-Yang, YANG Jie- .
Accurate Diagnosis Method for Belt Conveyor Fault
[J]. Metal Mine, 2020, 49(04): 130-134.
|
[9] |
WEI Jun, WANG 恩De, LIU Fu-Xing, WANG Wei.
Geological Characteristics,Ore Genesis and Prospecting Direction of Baiyun Gold Belt in Fengcheng City, Liaoning Province
[J]. Metal Mine, 2019, 48(08): 120-130.
|
[10] |
BAI Yan, WANG Zhi-Gang, WANG Gen-Hou, ZHU Li, YAO Fu-Sheng, Yan-Guo-Qiang.
Metallogenic Model of Fluorite Deposits in Siziwangqi,Inner Mongolia:Implications for the Prospecting of Volcanic Type Uranium Deposits
[J]. Metal Mine, 2019, 48(04): 121-128.
|
[11] |
BAI Xin, ZHU Peng-Rui, WAN Fei, JI Zhi.
Stability Assessment of the Actual Measured Goaf Based on Surpac-FLAC3D Coupling in Daye Iron Mine
[J]. Metal Mine, 2019, 48(01): 158-162.
|
[12] |
JI Heng-Zhao, CHEN Jin-Duo, ZHANG Kai, LI Jiao-Yan, LI Yu-Hui, YAN He-Long.
Geological Characteristics and Prospecting Prospective of Jinjiaya Antimony Deposit in Xichuan County, Henan Province
[J]. Metal Mine, 2018, 47(12): 127-133.
|
[13] |
YI Zhi-Qiang, GUO Xian-Pei, WEN Jing, YAN He-Long, XIE Ke, YANG Tao.
Metallogenic Geological Characteristics and Prospecting Potential of the Gold Deposit on the Both Sides of Xiguanzhuang-Zhenping Fault Zone in East Qinling
[J]. Metal Mine, 2018, 47(11): 112-119.
|
[14] |
LIU Na, REN Feng-Yu, ZHANG Dong-Jie.
Caving Process Control and Monitoring Technology of Mined-out Area in Xiaowanggou Iron Mine
[J]. Metal Mine, 2018, 47(04): 42-46.
|
[15] |
LI Zhan-Jin, HAO Jia-Wang, SUN Wen-Cheng, YANG Mei-Hong.
Numerical Simulation Analysis on Stability of Deep Large-scale Mining Rock Mass
[J]. Metal Mine, 2018, 47(02): 56-60.
|