Installment of Steel Structure Facilities of Vertical Water Sump

Zhang Liyong   

  1. Zhongdu International (Zambia) Co.,Ltd.
  • Online:2013-06-17 Published:2013-08-09

Abstract: The paper introduces the installment conditions of steel structure facilities of vertical sump in KDMP 985m pump house project of Zambia KONKOLA Copper Mine. Due to adopting the reasonable construction scheme,method and procedures and effective and safe technical measures,the engineering accident is avoided,and the construction period is also shortened,realizing the safe,high-quality,rapid construction.

Key words: Sump, Installation, Raft