[1] |
LI Mengqian, LI Mingduo, WANG Jinhua, HAN Xiuli, GAO Huishuang.
Study on Hyperspectral Accurate Estimation Method of Iron Grade for Iron Ore Powder
[J]. Metal Mine, 2023, 52(03): 206-213.
|
[2] |
SUN Xinrui, WANG Xuezhi, XIN Ming, HE Jingjing.
Preparation of Non-autoclaved Aerated Concrete with Silica-manganese Slag Composite Fly Ash
[J]. Metal Mine, 2023, 52(01): 289-295.
|
[3] |
LIU Wensheng, CHEN Nengge, ZHU Molin, YI Haibao, LI Wei, XIE Liangbo, DENG Guoping.
Test Study on the Effect of Digital Detonator High Precision Delay Time on Blasting Vibration
[J]. Metal Mine, 2021, 50(09): 37-43.
|
[4] |
GAO Xue-Peng- , Yu-Feng-Hai- , Ren- Qiang- , ZHANG Chuang- , Zhang-Yuan-Zhi- , Luo-Bo-Yuan.
Strata Movement Law and Strong Ground Behavior in Western Ordos Coalfield
[J]. Metal Mine, 2020, 49(06): 191-197.
|
[5] |
YAO Nan, LI Peng-Cheng, WANG Qi-Hu, YE Yi-Cheng, SUN Li-Jun, DENG Xing-Min, ZHANG Ying.
Synergetic Mining Technology for Strip-filling Zone of Gently Inclined Phosphate Deposits under Complex Terrain
[J]. Metal Mine, 2020, 50(05): 109-116.
|
[6] |
WANG Jun, LANG Jun-Biao, LI Gang, GAO Qian, ZHANG Jun-Ning.
Dynamic Stability Analysis of Mining-induced Foundation Tailings Reservoir under Fluid-solid Coupling
[J]. Metal Mine, 2019, 48(09): 172-178.
|
[7] |
LI Peng-Cheng, YE Yi-Cheng, YAO Nan, LUO Bin-Yu, CHEN Chang-Zhao.
Study on the Optimization of Mining Scheme for Gently Inclined Thin Orebody of Shaiqi River Phosphorite Mine in Yichang City
[J]. Metal Mine, 2019, 48(09): 34-40.
|
[8] |
XIONG Di, WU Hao, YANG Jian, GUO Shi-Tai.
Forecast of Short-term Deformation of Large-scale Slope Based on Regression Analysis and Robust Kalman Filter
[J]. Metal Mine, 2019, 48(04): 163-167.
|
[9] |
LU Li-Qun, YIN Yong-Fang, SHI Lei-Lei, TANG Yu-Long, XU Qing-Bin.
Strength Analysis on Boom of the Load-Haul-Dump Vehicles(LHD) Working Mechanism Based on the Influence of Welded Seam
[J]. Metal Mine, 2018, 47(02): 135-140.
|
[10] |
LI Zheng-Gang, WU Rong-Gao, XU Zhi-Qiang.
Control Technology of Return Fine Rate to Upward Medium-length Hole in Meishan Iron Mine
[J]. Metal Mine, 2017, 46(06): 47-52.
|
[11] |
ZHAO Li-Bing, LIU Li-Wei, LIANG Bing, ZHAO Yang, ZHANG Jin-Rui, CHE Dong-Mei.
Optimization for Magnetic Matrices Size of SLon High Intensity Magnetic Separator
[J]. Metal Mine, 2016, 45(08): 124-128.
|
[12] |
JIANG Chen, ZHANG Shu-Bi, WEN Xiao-Yong.
Deformation Monitoring Data Processing Method of Mining Area Based on Median Regression Analysis Method
[J]. Metal Mine, 2016, 45(05): 192-195.
|
[13] |
LU Bang-Wen, LIU Chang-Wu, XIE Hui, HE Tao, WANG Ding.
Law of Overburden Strata Movement and Mining Roadway Deformation under Mining Influence in the Unequal Length of Working Face
[J]. Metal Mine, 2016, 45(01): 34-38.
|
[14] |
MA Xue-Yan, LIAN Min-Jie, HU Xing-Bao, PAN Jian.
Similar Simulation on Press Ore Range of Open Pit in Dahongshan Iron Mine
[J]. Metal Mine, 2016, 45(01): 29-33.
|
[15] |
DONG Long-Bin, WANG Shao-Quan, JIN Chang-Yu, LIU Zhao-Sheng, ZHOU Yu.
Numerical Simulation of Factors Affecting Strata Movement Caused by Caving Method
[J]. Metal Mine, 2015, 44(09): 40-44.
|