[1] |
QU Fuming, WANG Huaiyuan, LIU Xiaobo, YUE Xingtong, MA Yipeng.
Study on the Whole Process Intelligent Mining Architecture and Key Technologies of Open-pit Mines
[J]. Metal Mine, 2024, 53(5): 134-.
|
[2] |
SI Junhong, WANG Haoyu, HUO Xiaoquan, YUE Dong, YUAN Zengyun, FAN Zhihai.
Study on Semi-enclosed Area Joint Dust Control Technology of Comprehensive Excavation Face
[J]. Metal Mine, 2024, 53(5): 126-.
|
[3] |
HUANG Shi, CHEN Zhaoyu, ZENG Lei.
Truck Scheduling Optimization Algorithm for Surface Mine Based on Lightweight Graph
Attention Mechanism
[J]. Metal Mine, 2024, 53(4): 202-.
|
[4] |
LI De, LI Cui, LIU Lei, SUN Mingzhi, QIN Lujun.
Research and Practice on Safe Mining Technology of Hanging Wall Ore in Deep Open-pit Mine
[J]. Metal Mine, 2024, 53(4): 7-.
|
[5] |
MENG Baowei, CHEN Xi.
Improved Retinex-Net Algorithm for Low Quality Image Enhancement in Open-pit Mine
[J]. Metal Mine, 2024, 53(3): 221-.
|
[6] |
ZHOU Chen′ao, ZHOU Keping, ZHANG Xiaoping, XU Jiye, LI Jielin, ZHANG Liangbing.
Simulation Analysis of Large-scale Open-Pit Mine Production Scheduling Oriented to Digital Twin
[J]. Metal Mine, 2024, 53(3): 190-.
|
[7] |
ZHAO Hongyu, HE Guichun, SHI Yan, JIANG Zhangsong, WU Weibo, .
Research on Flotation Recovery Rate Modeling Based on Deep Learning
[J]. Metal Mine, 2024, 53(01): 261-268.
|
[8] |
WANG Jiabin, LI Guoqing QIANG Xingbang BAI Yunlong WANG Qiuling ZHAO Wei.
Intelligent Analysis System of Mine Safety Risk Based on Dual Prevention System
[J]. Metal Mine, 2024, 53(01): 99-108.
|
[9] |
ZHANG Guosheng, DONG Xin, CHEN Yanting, YANG Tianhong, DENG Wenxue, LI Hua.
Study on Stability and Disaster Prevention Technology of Bedding Slope in Deep Open-Pit Mine
[J]. Metal Mine, 2023, 52(11): 253-260.
|
[10] |
LI Longlong, GONG Cheng, LI Yucheng, CUI Yunan, WU Xiaojun, LI Yuliang.
Three Dimensional Laser Scanning Point Cloud Composite Filtering Algorithm for Mine Roadway
[J]. Metal Mine, 2023, 52(11): 205-212.
|
[11] |
XIONG Hexi SUN Jiuyun YAN Zhigang ZHANG Xinnai.
Filtering Method of the Pit Dense Point Cloud Based on Peripheral Elastic Constraint
[J]. Metal Mine, 2023, 52(09): 127-133.
|
[12] |
ZHAO Ming, WANG Zhongxin, XIN Fengyang, WANG Jinjin, ZENG Xiangyu.
Multi-period Overall Optimization of Internal Dumping Short-term Programming by Truck in Open-pit Mine
[J]. Metal Mine, 2023, 52(09): 63-68.
|
[13] |
KAN Yuda.
Spatial Attitude Parameter Solving and Free Resistance Distance Blasting Warning Method for Curved Drill Holes in Open-pit Mines
[J]. Metal Mine, 2023, 52(07): 192-197.
|
[14] |
SI Junhong, WANG Haoyu, HUO Xiaoquan, HU Wei, YUAN Zengyun, FAN Zhihai.
Study and Application of Air Fog Vortex Dust Removal Technique in Fully Mechanized Excavating Face
[J]. Metal Mine, 2023, 52(07): 135-141.
|
[15] |
WANG Tianyang, SHI Jing, ZHOU Yuzhu, JIN Longzhe, LIU Jianguo, LI Gang, SUN Zhucong, LI Jian, CHEN Changling, DING Yao.
Research and Development of a New Drilling Dust Removal Device Based on Water Jet Injection and Dry Mist Dust Reduction Technology
[J]. Metal Mine, 2023, 52(07): 120-128.
|