[1] |
LI Mengqian, LI Mingduo, WANG Jinhua, HAN Xiuli, GAO Huishuang.
Study on Hyperspectral Accurate Estimation Method of Iron Grade for Iron Ore Powder
[J]. Metal Mine, 2023, 52(03): 206-213.
|
[2] |
WU Hao, FAN Hongdong, ZHENG Chunliu, LIU Jiuli.
Deformation Monitoring and Analysis of Tailings Dam Based on DS-InSAR:A Case Study of Brumadinho Mine in Brazil
[J]. Metal Mine, 2023, 52(03): 169-176.
|
[3] |
SUN Xinrui, WANG Xuezhi, XIN Ming, HE Jingjing.
Preparation of Non-autoclaved Aerated Concrete with Silica-manganese Slag Composite Fly Ash
[J]. Metal Mine, 2023, 52(01): 289-295.
|
[4] |
LI Minggeng, ZHANG Shubi, GAO Yandong, LI Shijin, ZHANG Yansuo, JIA Yikun, KONG Lingchen.
Optimized DS-InSAR Technology for Time Series Deformation Monitoring in Open-pit Mines
[J]. Metal Mine, 2023, 52(01): 110-118.
|
[5] |
ZHANG Lianpeng, LIANG Liang, CHEN Bingqian, HU Jinshan, YU Yang, QIN Lu, YU Hao, YANG Jiale, YANG Yu.
Spatio-temporal Monitoring and Analysis Method of Multi-dimensional Surface Deformation of Closed Mines Based on SBAS-InSAR Technique
[J]. Metal Mine, 2023, 52(01): 83-94.
|
[6] |
LI Shibao, WANG Lei, TENG Chaoqun, LI Jingyu, LI Zhong, HANG Jinzhong.
Data Processing and Prediction Integrated System of Mining Subsidence Movement and Deformation
[J]. Metal Mine, 2022, 51(03): 165-170.
|
[7] |
LIU Wensheng, CHEN Nengge, ZHU Molin, YI Haibao, LI Wei, XIE Liangbo, DENG Guoping.
Test Study on the Effect of Digital Detonator High Precision Delay Time on Blasting Vibration
[J]. Metal Mine, 2021, 50(09): 37-43.
|
[8] |
LIU Xiaoyang, LI Feng, SUN Guangtong, QIAN An, ZHU Hong, LI Jiale.
A New Method for Deformation Monitoring of High Slope in Open-pit Mine
[J]. Metal Mine, 2020, 49(11): 59-65.
|
[9] |
Li Lifeng, Han Liuping, Zhang Xiaohu, Deng Huilin.
Bolt-TECCO Net Supporting Technique in the Deep Mine Roadway with High Ground Stress in Jinchuan Mining Area
[J]. Metal Mine, 2020, 49(07): 47-52.
|
[10] |
WANG Jun, LANG Jun-Biao, LI Gang, GAO Qian, ZHANG Jun-Ning.
Dynamic Stability Analysis of Mining-induced Foundation Tailings Reservoir under Fluid-solid Coupling
[J]. Metal Mine, 2019, 48(09): 172-178.
|
[11] |
WU Hao, LI Zhen, LU Qing-Hua, XIONG Di, ZHANG Xiang.
Optimization Method of Point Location Layout for Slope Deformation Monitoring by Using Sensitivity and Correlation
[J]. Metal Mine, 2019, 48(04): 180-184.
|
[12] |
XIONG Di, WU Hao, YANG Jian, GUO Shi-Tai.
Forecast of Short-term Deformation of Large-scale Slope Based on Regression Analysis and Robust Kalman Filter
[J]. Metal Mine, 2019, 48(04): 163-167.
|
[13] |
FENG Teng-Fei, LIU Xiao-Sheng, ZHONG Yu, MA Yu-Qing.
Slope Deformation Prediction in Mining Area Based on IGM-LSSVM Model
[J]. Metal Mine, 2019, 48(03): 168-172.
|
[14] |
LIAN Xu-Gang, CAI Yin-Fei, HU Hai-Feng.
Application Status and Existing Problems of 3D Laser Scanning Technique in Mine Surveying in China
[J]. Metal Mine, 2019, 48(03): 35-40.
|
[15] |
LIU Dong, SHAO An-Lin, JIN Chang-Yu, WANG Xu-Gang, JING Hong-Di, FAN Fu-Quan.
Numerical Simulation for Supporting Scheme of Soft Rock Roadway in Baoguo Iron Mine
[J]. Metal Mine, 2018, 47(10): 41-45.
|