[1] |
ZHU Junge, YU Hongyu, WANG Haodong, MA Qiangying, LU Zengxiang.
Research on Scheduling of Underground Trackless Vehicle Based on Right-of-way Priority
[J]. Metal Mine, 2024, 53(3): 53-.
|
[2] |
ZHANG Yongxi, XIANG Jiangbo ZHOU Keping, YOU Xintian FU Yiling YANG Chengye, XU Chun, CHENG Xiliang.
Research and Application of Multi-equipment Collaborative Intelligent Mining System in Zijinshan Gold and Copper Mine Underground Mining Site
[J]. Metal Mine, 2024, 53(01): 55-63.
|
[3] |
ZHANG Guoyang, YANG Zhichao, TENG Qing, HAN Yingqi, ZHANG Suhong, LIU Shengyu.
Experimental Study on Synergistic Removal of Cu(Ⅱ ) in Simulated Mineral Processing Wastewater by Xanthan Gum and Butyl Xanthate
[J]. Metal Mine, 2023, 52(03): 259-265.
|
[4] |
QIN Ruibo, ZHU Wancheng, XU Xiaodong, LI Hui, CHEN Chengzhen, SONG Qingwei .
Construction of Underground Stope Environment Perception Test Platform After Blasting Based on Mixed Reality Technology
[J]. Metal Mine, 2023, 52(03): 185-192.
|
[5] |
MA Xinbo, JING Hongdi, LIU Xiaobo, YU Jianyang, SUN Xiaoyu.
Study on Inspection System of Underground Mine Equipment Based on Mixed Reality
[J]. Metal Mine, 2022, 51(09): 188-193.
|
[6] |
LI Wenjing, JIAO Yuhao, QIU Li, ZHANG Xinxin, REN Dajun.
Parametric Modeling of Mine Roadway Based on Dynamo
[J]. Metal Mine, 2022, 51(09): 63-70.
|
[7] |
WANG Hao, HU Nailian, LI Guoqing, HOU Jie, QIANG Xingbang.
Research and Development of Short Interval Control Management System for Underground Mine Scheduling
[J]. Metal Mine, 2022, 51(01): 213-220.
|
[8] |
WU Haojun, JI Hongguang, GONG Min, LIU Xiangyu.
Present Application Status of Rock Drilling Equipment in Underground Mine and the Development Direction for Intelligent Rock Drilling in China
[J]. Metal Mine, 2021, 50(01): 185-201.
|
[9] |
ZHANG FengJie, DAI Bibo, YANG Xiaoming.
Study on Large Capacity Routing and Wavelength Assignment Algorithms for Wavelength Division Multiplexing Optical Networks for Information Transmitting in Underground Mines
[J]. Metal Mine, 2020, 49(11): 66-70.
|
[10] |
ZHANG Bo, JIANG Zhong-An, DUAN Zhi-Bo, JI Yin-Feng.
Study on the Dust Removal Effect of Air-water Spraying Nozzle
[J]. Metal Mine, 2019, 48(08): 173-178.
|
[11] |
XU Xiu-Ping, WAN Li-Li.
Research on the Key Regions and Time Quantum of the Dust Controlling in the Process of Non-coal Underground Mining
[J]. Metal Mine, 2016, 45(06): 153-156.
|
[12] |
TANG Yun, YANG Dian-Qi, WANG Xue, TANG Li-Jing.
Synergistic Effect of Fatty Acid and Hydroxamic Acid in Flotation Separation of Apatite and Dolomite
[J]. Metal Mine, 2016, 45(04): 86-90.
|
[13] |
GU Xin-Yu, SHI Jun-Wen, WANG Ting-Yin.
Direct Dust Fall Technology for Chamber in Underground Metal Mine
[J]. Metal Mine, 2016, 45(03): 160-162.
|
[14] |
LI Jia-Bin, CAI Qing-Xiang, LIU Fu-Ming, YIN Wen-Ying, YANG Fei, REN Zhi-Hong.
Study on the Covered Resources Recycling Scheme of Underground Mine in Planning Area of Residents Relocation Village
[J]. Metal Mine, 2016, 45(03): 58-61.
|
[15] |
CUI Xiao-Rong, LIN Mou-Jin, YU Hong, ZHENG Bing-Xu.
Research of Exploitation Procedures of Open-pit Mines Transferred from Underground Mining
[J]. Metal Mine, 2016, 45(02): 30-35.
|