欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2009, Vol. 39 ›› Issue (06): 35-39.

• 采矿工程 • 上一篇    下一篇

岩金开采独立采空区与人工底柱的稳定性分析

刘丽华1,龚清平2,罗铁牛2
  

  1. 1.长春工程学院;2.广东高要河台金矿
  • 出版日期:2009-06-08 发布日期:2011-07-21

Stability Analysis of Independent Mined-out Area and Artificial Pillars in Gold Rock Mining

Liu Lihua1,Gong Qingping2,Luo Tieniu2   

  1. 1.Changchun Institute of Technology;2.Gaoyao Hetai Gold Mine of Guangdong
  • Online:2009-06-08 Published:2011-07-21

摘要: 对薄和中厚矿体岩金开采所开展采矿方法综合试验研究,采用人工底柱浅眼留矿法所存在的独立采空区与其揭露的钢筋混凝土人工底柱,进行稳定性分析研究,以便对这类采空区的独立存在与人工底柱的施工质量进行评价,为矿山以后做到安全生产、缩短工程时间、减少材料消耗、增加企业效益提供帮助。

关键词: 浅眼留矿法, 独立采空区, 钢筋混凝土人工底柱, 稳定性, 分析研究

Abstract: A comprehensive test on the mining method for thin and medium thick gold rock deposit was carried out. Stability analysis was made on an independent mined-out area by short-hole shrinkage stoping with artificial pillars and its reinforced concrete artificial pillars so as to evaluate their engineering quality, which aimed to provide an assistance to increasing the enterprise benefits by safe production, shortening the engineering period and reducing material consumption.

Key words: Short-hole shrinkage stoping, Independent mined-out area, Reinforced concrete artificial pillars, Stability, Analysis and research