金属矿山 ›› 2009, Vol. 39 ›› Issue (10): 114-116+125.
• 矿物工程 • 上一篇 下一篇
侯晓东1,张艳芳2
出版日期:
发布日期:
基金资助:
国家危机矿山资源接替项目(编号:200636030)。
Hou Xiaodong1,Zheng Yanfang2
Online:
Published:
摘要: 银山铜铅锌金银多金属矿区的地层是以千枚岩为主的,由于千枚岩片理极为发育,产状变化大,因此,以往在中深孔钻探施工过程中,均存在着钻孔弯曲度超规范的情况,严重制约着钻孔质量。为了有效解决这一难题,提高钻孔质量和探矿效果,组织进行了技术攻关,采取以预飘为主的措施,取得较好成效。
关键词: 钻孔倾角, 预飘, 钻探
Abstract: The strata in Yinshan Au-Cu lead-zinc multi-metal mine are mainly in form of phyllite.Due to the complex schistosity of phyllite and big occurrence change,the degree of borehole curvature is over norms in deep-hole drilling construction process,which seriously hampered the drilling quality.In order to effectively resolve this problem and improve the drilling quality and exploration results,a technical breakthrough is made,where pre-floating measures are adopted with better results.
Key words: Dip angle in drill-hole, Pre-floating, Drilling
侯晓东, 张艳芳. 预飘措施在复杂地层中深孔钻探中的运用[J]. 金属矿山, 2009, 39(10): 114-116+125.
HOU Xiao-Dong, ZHANG Yan-Fang. Application of Pre-floating Measures in Deep-hole Drilling in the Complex Strata[J]. Metal Mine, 2009, 39(10): 114-116+125.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.jsks.net.cn/CN/
http://www.jsks.net.cn/CN/Y2009/V39/I10/114