金属矿山 ›› 2011, Vol. 40 ›› Issue (11): 5-8+68.
• 采矿工程 • 上一篇 下一篇
张智明1,2,3,才庆祥1,2,周伟1,2,王博文1,2,威华1,2
出版日期:
发布日期:
基金资助:
* “十一五”国家科技支撑计划项目(编号:2006BAB16B00),国家自然科学基金重点项目(编号:51034005),煤炭资源与安全开采国家重点实验室自主研究课题(编号:SKLCRSM10X01),中央高校基本科研业务费专项资金项目(编号:2010QNA33)。
Zhang Zhiming1,2,3,Cai Qinxiang1,2,Zhou Wei1,2,Wang Bowen1,2,Wei Hua1,2
Online:
Published:
Abstract: Study of centralized mining model and integrated technology match mode not only is the development trend of modern open pit coal mine,but also is one of the problems large open pit coal mine in China facing currently.By analysising exploitation of scale constraints comprehensively.With the objective of maximizing revenue to construct a single scale pit reasonable revenue function.By integer programming methods,established a multi-scale pit production model of the rational.And by analysising of Antaibao open pit,the results showed that the reasonable production scale of Antaibao was 22.0 Mt/a.
Key words: Surface coal mines, Production scale model, Factors
中图分类号:
null
张智明, 才庆祥, 周伟, 王博文, 威华. 露天矿生产规模的确定模型[J]. 金属矿山, 2011, 40(11): 5-8+68.
ZHANG Zhi-Ming, CAI Qing-Xiang, ZHOU Wei, WANG Bo-Wen, WEI Hua. Scale Model to Determine the Open Pit Production[J]. Metal Mine, 2011, 40(11): 5-8+68.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.jsks.net.cn/CN/
http://www.jsks.net.cn/CN/Y2011/V40/I11/5