金属矿山 ›› 2012, Vol. 41 ›› Issue (01): 1-4+9.

• 采矿工程 •    下一篇

归来庄矿露天转地下安全高效开采动态调控技术研究

徐帅1,李元辉1,韩洪江2,祝德平2   

  1. 1.东北大学土木与资源学院;2.山东黄金归来庄矿业有限公司
  • 出版日期:2012-01-11 发布日期:2012-01-11
  • 基金资助:

    * 国家重点基础研究发展计划(973计划)项目(编号:2010CB732006),教育部基本科研业务费项目青年教师科研启动基金项目(编号:90301002),中央高校基本科研业务费专项资金项目(编号:90401006)。

Study on the Dynamic Monitoring Technology of Safe and Efficient Mining in Guilaizhuang from Open-pit to Underground

Xu Shuai1,Li Yuanhui1,Han Hongjiang2,Zhu Deping2   

  1. 1.College of Resources & Civil Engineering,Northeastern University;2.Shandong Gold Group,Gui Laizhuang Mining Co.Ltd
  • Online:2012-01-11 Published:2012-01-11

摘要: 针对归来庄金矿露天转地下开采过程中面临的诸多难题,以动态调控的思想,提出了结合工程实际,在露天转地下过程中对露天转地下的各个工艺、工种、工序在数量和程度上进行合理安排与控制,如采取联合开拓运输系统、开展双向对掘施工方案和布置措施工程,大大提升井下工程施工进展;开展高陡边坡稳定性分级和锚索锚网分区加固工作,维护露天边坡安全;进行不扩帮延伸回采及同步境界矿柱铺设工作,隔离露天与地下生产;推进多作业地点、多种采矿方法并行作业,确保露天产转地高效生产;实施多种防措施及排水工程,力保大水矿山露天转地下安全生产。露天转地下安全高效动态调控技术的研究与合理、有序的施工组织,为归来庄露天矿实现不减产平稳过渡成功,安全、高效回采提供了保证。  

关键词: 露天转地下, 高陡边坡, 大水矿山, 安全高效生产, 动态调控

Abstract: In view of mary difficulties in underground construction,put forward the proposal of dynamic monitoring in the process from open-pit to underground mining,rational arrangement and monitoring in the number and degree should be adopted to related techniques,working category and procedures.The underground construction was greatly improved by applying united exploiting and transporting system,as well as bidirectional digging scheme and layout; ensured the safety of open-pit side slope by grading the stability of high and steep side slopes and sectioning and reinforcing the anchor cable and net; separated open-pit from underground production by applying the extension method without expanding side slope and allocating in-phase separated pillars; ensured highly efficient production from open-pit to underground by conducting multi-location and multi-method operation; improved the safety for Large waterflow mine from open-pit to underground by carrying out various precautious and draining measures.With the further study of dynamic monitoring technology in the safe and efficient mining from open-pit to underground,as well as the rational and orderly construction organization,Guilaizhuang Open-pit Mine witnessed a successful transition from open-pit to underground mining without any decreasing output.Meanwhile,the safe and efficient exploitation may be ensured in this case.

Key words: Open-pit to underground, High and steep side slope, Large waterflow mine, Safe and efficient production, Dynamic monitoring