欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2014, Vol. 43 ›› Issue (05): 5-9.

• 采矿工程 • 上一篇    下一篇

高水材料充填开采工作面顶底板岩层活动规律分析

谢辉1,2,刘长武1,2,何涛1,2   

  1. 1.水力学与山区河流开发保护国家重点实验室,四川 成都 610065;2.四川大学水利水电学院,四川 成都 610065
  • 出版日期:2014-05-15 发布日期:2014-09-11
  • 基金资助:

    * 国家重点基础研究发展计划(973计划)项目(编号:2010CB226802),国家自然科学基金煤炭联合基金重点项目(编号:51134081)。

Analysis on the Law of Roof and Floor Strata Movement in Coal Mining with High-water Material Backfilling

Xie Hui1,2,Liu Changwu1,2,He Tao1,2   

  1. 1.State Key Laboratory of Hydraulics and Mountain River Engineering,Chengdu 610065,China;2.College of Water Resource and Hydropower,Sichuan University,Chengdu 610065,China
  • Online:2014-05-15 Published:2014-09-11

摘要: 以冀中能源股份有限公司邢东矿1128高水材料充填工作面为研究对象,分析了高水材料的充填方法,并采用电子电镜扫描和MTS实验系统测试了高水材料的内部结构、容重、含水率和体积应变等物理力学特征。结合充填开采工作面顶底板现场测试数据,分析了高水材料与岩层相互作用下,充填工作面顶板活动规律以及工作面底板破坏深度。结果表明:高水材料利用管道输送,采用混合式充填方法进行采空区充填的效率较高;高水材料具有较好的塑性,水灰比越大,材料强度越低,体积应变越大,材料塑性表现越明显;高水材料充填处理采空区时,采场围岩的应力状态受到改变,工作面前方扰动距离为27.7 m左右,底板岩层最大破坏深度约为22 m;采用高水材料充填开采减小了底板岩层的破坏深度,缩短了工作面前方扰动距离,有效地控制了矿压显现。

关键词: 高水材料, 采空区充填, 物理力学特征, 体积应变, 顶底板岩层

Abstract: Taking 1128 working face filled by high-water-content material in Xingdong coal mine,Jizhong Energy Resources Co.,Ltd. as research object,and through analyzing the filling method with high water material,testing physical and mechanical characteristics of high water material such as internal structure,unit weight,moisture content and volume strain by scanning electron microscope (SEM) and MTS in the laboratory,roof activity patterns and floor failure depth under the reaction of high water material and rock strata were researched combining with the field test data in filling working face.The results showed that filling efficiency in mined-out area was greatly improved when high water material was transported by pipes and adopting the hybrid-type filling method.High water material has good plasticity.With the increase of water-cement ratio,the material′s compressive strength decreased,and volume strain increased,and the material′s plasticity performs more obvious; When the underground goaf was filled by high-water material,stress state in surrounding rock was changed.The perturbations distance in front of working face was about 27.7 m,and the maximum failure depth in floor strata was about 22 m.The filling mining with high-water material decreased floor failure depth,shortened the perturbations distance ahead of working face and effectively controlled ground pressure′s behaviors.

Key words: High-water material, Goaf filling, Physical and mechanical characteristics, Volume strain, Roof and floor strata