尾矿库溃坝滑坡体滑移距离的研究

郭天勇1,武伟伟2,段蔚平3,杨强胜3   

  1. 1.长沙有色冶金设计研究院有限公司,湖南 长沙 410011;2.北京国信安科技术有限公司,北京 100160;3.华唯金属矿产资源高效循环利用国家工程研究中心有限公司,安徽 马鞍山 243000
  • 出版日期:2014-12-15 发布日期:2015-07-23

Slip Distance Estimation of Tailing Dam-break Landslide

Guo Tianyong1,Wu Weiwei2,Duan Weiping3,Yang Qiangsheng3   

  1. 1.Changsha Engineering & Research Institute Ltd.of Nonferrous Metallurgy,Changsha 410011,China;2.Beijing Guoxin'anke Technology Co.,Ltd.,Beijing 100160,China;3.Huawei National Engineering Research Center of High Efficiency Cyclic Utilization of Metal Mineral Resources Co.,Ltd.,Maanshan 243000,China
  • Online:2014-12-15 Published:2015-07-23

摘要: 尾矿库是一个具有高势能的人造泥石流危险源,尾矿库一旦发生溃坝事故,将产生巨大冲击力和破坏力。为了在有限的应急处置时间内制定及时有效的应急避险预案,减少溃坝后的人员伤亡、经济损失和生态环境破坏,需要正确估算溃坝后尾矿掩埋区滑移范围,即主要确定溃坝滑坡体滑移距离。针对尾矿库溃坝滑坡体滑移距离估算,提出了刚体沿折面滑动和刚体沿圆弧曲面滑动的2种滑动模型,分别建立了溃坝滑坡体滑移距离的计算公式。重点分析了扩散角、掺气深度、空气阻力、滑移体高度、残余强度、撞击动压力和拦挡坝等尾矿库溃坝发生滑移所涉及到的几个主要问题。通过实例计算,2种滑动模型的计算结果都与实际情况较为接近,可为今后尾矿库的安全管理以及选址提供参考。

关键词: 尾矿库, 溃坝, 滑动模型, 滑移距离

Abstract: Tailing pond is a great dangerous source of man-made mud-rock flow with high potential energy.Tailings dam-break accident will result in huge impact and destruction when it happens.In order to make emergency hedge plan timely and effectively at the limited time of emergency disposal to reduce the casualties,economic losses,and destruction of ecological environment caused by dam collapse,the slip range the buried tailing area after dam-break need to be correctly estimated,that is,mainly determining the slip distance of dam landslide.In view of the sliding distance estimation of dam-break landslide of tailings,two kinds of sliding model,the rigid sliding along the fold surface model and the rigid sliding along the circular arc surface model,are introduced,and their calculation formulas for dam landslide slip distance are set up.Several main problems related to the landslide of tailings dam-break including diffusion angle,aeration depth,air resistance,slip body height,residual strength,impact several main problems of dynamic pressure and dam are discussed.Through calculation,the results of the both sliding models approach to the actual situation.The two models can provide the reference for the safety management as well as the location of the tailings.

Key words: Tailings dam, Dam-break, Sliding model, Slip distance