强富水灰岩区下矿体绿色开采理念与实践

刘培正1,2,孙向远3,周伟3,张传信1,2,胡永泉1,2   

  1. 1.中钢集团马鞍山矿山研究院有限公司,安徽 马鞍山 243000;2.金属矿山安全与健康国家重点实验室,安徽 马鞍山 243000;3.徐州铁矿集团有限公司,江苏 徐州 221000
  • 出版日期:2014-12-15 发布日期:2015-07-23

Theory and Practice of Green Mining of Ore-body under Limestone District with Abundant Water

Liu Peizheng1,2,Sun Xiangyuan3,Zhou Wei3,Zhang Chuanxin1,2,Hu Yongquan1,2   

  1. 1.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.,Maanshan 243000,China;2.State Key Laboratory of Safety and Health for Metal Mine,Maanshan 243000,China;3.Xuzhou Iron Mine Group Ltd.,Xuzhou 221000,China
  • Online:2014-12-15 Published:2015-07-23

摘要: 针对吴庄铁矿井下涌水量大,地表有村庄,农田不允许塌陷,尾矿库已饱和等复杂的开采环境,提出了适合该矿的绿色开采理念及技术措施。采取“地表井下联合以帷幕注浆为主的外截内排”的防治水方案,即在地表灌溉渠浇筑、锚喷以阻断地表水体对井下的间接补给,地面帷幕注浆封堵富水断层,阻断水源通道,以及井下浇筑堵水墙防止注浆液从突水点涌出、流失的地面井下联合防治水措施。选用分段空场采矿嗣后充填法,利用尾砂胶结料及时对空区进行充填,为空区顶板和注浆帷幕的稳定性提供了保障,避免了地表塌陷。 研制了一种适合2种进料方式的地表充填站,取自尾矿库的干料采用自卸汽车运输至充填站,由大倾角皮带机输送至砂仓,而选厂排放的尾砂,直接经管道泵送。项目实施后,井下正常涌水量由原来的1 260 m3/h减少到300 m3/h,降低了76%,节省了排水费用,并且保护了地下水资源;采用的充填采矿法避免了地表塌陷,减少了征地及迁村的费用,同时将回采率由原来的67%提高到89%;而选用尾砂作为充填料,又有效解决了尾砂堆放的问题。

关键词: 绿色开采, 帷幕注浆, 联合防治水措施, 嗣后充填法, 大倾角皮带

Abstract: Aiming at the complex mining conditions of heavy water inflow underground,subsidence of village and farmland not allowed,and saturated tailing pond in Wuzhuang Iron Mine,the theory and the related technological measures of green mining for the mine are proposed as follows.Adopting the water prevention and control program of “inner plugging and outer discharging with curtain grouting as main in surface and underground”,that is,stopping indirect water supply from surface to underground by irrigation channel cementing and anchoring.In this process,curtain grouting plugs the water-rich faults to cut off water from surface,at the same time the water-blocked wall at underground is built to prevent from the grouting liquid gushing and washing away from water gushing point.Taking the sublevel open-stoping method with subsequent backfill.Tailing cementing material are timely filled into the mined-out area to ensure the stability of goaf roof and grouting curtain and to prevent surface subsidence.Building the backfill station on surface for two kinds of feeding method.Dry materials from tailing pond are transported to the backfill station by truck and conveyed into sand bunker by large inclined angle belt conveyor,while the tailings from concentration plant are pumped by pipeline directly.After this program put into practice,underground water inflow decreased from 1 260 m3/h to 300 m3/h,lower by 76%,and also the drainage costs are saved and underground resources are protected.The backfill mining method avoids from surface subsidence,decreases land requisition and village relocation,and raises the mining recovery from 67% to 89%.Also,with tailings as backfill materials,the tailing stacking problem is solved.

Key words: Green mining, Curtain grouting, Water prevention and control measure, Backfill mining method, Large inclined angle belt conveyor