欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2015, Vol. 44 ›› Issue (03): 133-137.

• 地质与测量 • 上一篇    下一篇

基于灰色-模糊理论的矿产资源地质勘查评价

吴安兵1,2,3,郭科2,3,柳炳利2,3   

  1. 1.成都理工大学商学院,四川 成都 610059;2.四川省数学地质重点实验室,四川 成都 610059;3.四川省矿产资源研究中心,四川 成都 610059
  • 出版日期:2015-03-15 发布日期:2015-07-31
  • 基金资助:

    * 中国地质调查局地质调查项目(编号:12120113092300,12120113091700)。

Evaluation of Geological Exploration of Mineral Resources Based on Gray-Fuzzy Theory: A Case Study in Central Tibet

Wu Anbing1,2,3,Guo Ke2,3,Liu Bingli2,3   

  1. 1.School of Business,Chengdu University of Technology,Chengdu 610059,China;2.Geo-mathematics Key Laboratory of Sichuan Province,Chengdu 610059,China;3.Mineral Resources Research Center of Sichuan Province,Chengdu 610059,China
  • Online:2015-03-15 Published:2015-07-31

摘要: 矿产资源地质勘查综合评价的目的是获取评价区的勘查优劣程度和资源保障程度等信息,为提高开发效率、优化开发结构以及矿山环境保护与治理评价等后续工作提供依据。以藏中地区为例,选取了多金属矿、铜矿、钼矿、铬铁矿等9种优势矿种作为主要评价对象,并在分析西藏自治区前2轮矿产资源规划的基础上,划分出33个地质勘查评价单元。综合考虑工作程度、实物工作量、资源储量及质量特征、勘查技术等4类因素,建立了矿产资源地质勘查评价指标体系。将层次分析法(Analytic hierarchy process,AHP)和专家打分法相结合确定各评价指标的权重,采用基于灰色关联度的模糊综合评价模型进行综合评价,为该地区新一轮的矿产资源规划提供参考。

关键词: 地质勘查评价, 矿产资源规划, 层次分析法, 灰色关联度, 模糊综合评价模型

Abstract: The goal for comprehensive evaluation of mineral resources is to obtain the information of mineral exploration and the degree of resources security in the evaluation area so as to provide basis for the following work such as improving development efficiency,optimizing the structure of mineral development,conducting evaluation of mine environmental protection and governance.Taking the middle area of Tibet as the research example,the nine advantageous resources such as polymetallic ore,copper ore,molybdenum core,chromite ore are selected as the mine object of evaluation.The 33 geological exploration evaluation units are divided based on analyzing the existing two mineral resources planning of Tibet autonomous region.The evaluation index system for geology exploration of mineral resources is established by considering the four kinds of factors such as degree of work,physical effort,resources and quality characteristics and exploration technology synthetically.The weight values of evaluation index are calculated by using the analytic hierarchy process (AHP) and expert scoring method.The fuzzy comprehensive evaluation is conducted by using the fuzzy comprehensive evaluation model based on grey correlation degree so as to provide some reference for the new mineral resources planning in this research area.

Key words: Evaluation of geological exploration, Mineral resources planning, Analytic hierarchy process, Grey correlation degree, Fuzzy comprehensive evaluation model