金属矿山 ›› 2015, Vol. 44 ›› Issue (05): 24-27.

• 采矿工程 • 上一篇    下一篇

建筑物下矿山充填条带参数优化及稳定性分析

张贵银1,薛善彬2,张亮1,魏建振3,徐宁辉1   

  1. 1.山东科技大学矿业与安全工程学院,山东 青岛 266590;2.中国矿业大学(北京)资源与安全工程学院,北京 100083;3.滕州郭庄矿业有限责任公司锦丘煤矿,山东 滕州 277500
  • 出版日期:2015-05-15 发布日期:2015-08-04
  • 基金资助:

    * 山东省自然科学基金项目(编号:ZR2012EEM022)。

Strip-filling Parameter Optimization and Stability Analysis of a Coal Mine under Buildings

Zhang Guiyin1,Xue Shanbin2,Zhang Liang1,Wei Jianzhen3,Xu Ninghui1   

  1. 1.College of Mining and Safety Engineering,Shandong University of Science and Technology,Qingdao 266590,China;2.College of Resources and Safety Engineering,China University of Mining and Technology (Beijing),Beijing 100083,China;3.Jinqiu Coal Mine,Tengzhou Guozhuang Mining Co.,Ltd.,Tengzhou 277500,China
  • Online:2015-05-15 Published:2015-08-04

摘要: 为解决某矿3煤村下压煤开采难题,尽可能提高煤炭资源回收率,需对充填条带参数进行研究。根据关键层理论,对3煤层顶板极限跨度进行计算研究,可知该矿顶板条件下未充填区域宽度小于41.8 m时,基本顶不会发生断裂;在此基础上采用FLAC3D数值模拟软件对3个条带充填方案进行分析,研究不同充填体宽度和一定充填间隔距离条件下充填条带的塑性区范围和应力分布规律,研究结果表明:应尽量使充填率控制在70%以下。根据对不同模拟方案进行比较分析可知,在充填率为55.5%时,条带充填体塑性区比例为30%左右,充填体弹性核区能够长期稳定。实践表明3煤在此充填条带参数下开采,可确保地表建筑物在Ⅰ级破坏范围内,且利用矸石充填,对实现矿区绿色开采具有重要意义。

关键词: &ldquo, 三下&rdquo, 开采, 充填条带, 数值模拟, 参数优化, 稳定性分析

Abstract: To solve the problems in coal mining under buildings,railroads and water bodies and improve recovery of coal resources,the strip-filling parameters in a coal mine are investigated.According to the key strata theory,the limit span of roof for the "under-three" coal seam is calculated.It is known that the fracture of basic roof can not occur in this coal mine when the width of unfilled area is less than 41.8 m.Based on this,three strip-filling programs are analyzed by numerical simulation software FLAC3D to research the plastic zone and stress distribution of strip-filling under different width of backfill and the fixed filling space.The results show that the filling rate should be controlled at 70% or less.Through the comparison and analysis of different simulation programs,the ratio of plastic zone in strip-filling is about 30%,and the elastic core of backfill is of long-term stability,when the filling rate is 55.5%.Practices show that the destruction of surface buildings is within the range of gradeⅠwhen "under-three' mining happens under these strip-filling parameters.It is significant of using waste rock to achieve the green mining.

Key words: "Under-three", coal mining, Filling strip, Numerical simulation, Parameter optimization, Stability analysis