金属矿山 ›› 2015, Vol. 44 ›› Issue (06): 34-37.

• 采矿工程 • 上一篇    下一篇

下告铁矿悬顶成因分析及预防措施研究

雷刚1,陈诗墨1,张杰2   

  1. 1.西南科技大学环境与资源学院,四川 绵阳 621000;2.广东省河源市紫金县下告铁矿,广东 河源 517000
  • 出版日期:2015-06-15 发布日期:2015-08-05

Origin Analysis of Hanging Arch in Xiagao Iron Mine and Its Preventive Measures

Lei Gang1,Chen Shimo1,Zhang Jie2   

  1. 1.School of Environment and Resources,Southwest University of Science and Technology,Mianyang 621000,China;2.Xiagao Iron Mine of Heyuan,Guangdong Province,Heyuan 517000,China
  • Online:2015-06-15 Published:2015-08-05

摘要: 下告铁矿采用了高效、安全的无底柱分段崩落法进行开采, 2013年9月,在-26 m分段、-37 m分段中共有5条进路几乎同时出现了悬顶现象。大面积的悬顶除了因矿体自身稳固性差以外,更主要的是设计和施工没有根据矿山自身的情况进行合理的布置。切割槽高度不够、上盘矿体的出矿量没能达到要求,爆破的夹制性过大等因素导致矿体顶板高度不断下降,致使后续炮孔爆破补偿空间不足。同时设计预留排面保护层过厚,装药密度过低,炮孔没有堵塞等因素使得顶部矿石难以贯穿上分段覆盖层,爆破产生大量大块,为悬顶的产生埋下隐患。矿山通过认真研究和实践,从设计到施工进行了分析和总结,针对矿山目前的开采现状提出了预防处理意见,为解决悬顶的频繁发生提供技术支撑。

关键词: 无底柱分段崩落法, 悬顶成因, 预防措施

Abstract: The non pillar sublevel caving method with high efficiency and safety was adopted in Xiagao Iron Mine.In September,2013,the roof hanging phenomenon almost appeared at the same time in the -26 m section and -37 m section containing 5 routes.Besides the poor stability of the ore-body,the main reason for large-scale roof hanging is that the design and construction is not reasonably arranged according to its own situation of mine.The insufficient height of cutting groove,and the less ore-drawing quantity from upper ore-body can not meet the requirements.Some factors such as too much blasting destruction lead to the roof height of ore-body declining,and leave insufficient compensation space for follow-up holes blasting.At the same time,such factors as thick reserved row surface protection layer in design,lower charge density,and no clogging at the top of holes make it difficult to penetrate through the upper covering layer.Blasting produces a large number of bulks,which hides the dangers for the suspension roof.By means of study and practice on the design and construction,the prevention measures are put forward for the present situation of mining,thus providing the technical support so as to avoid from frequent appearance of hanging arch.

Key words: Non-pillar sublevel caving method, Analysis of hanging arch, Preventive measures