欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2015, Vol. 44 ›› Issue (09): 116-121.

• 机电与自动化 • 上一篇    下一篇

中空注浆锚索破坏规律分析及关键技术性能优化

黄中峰   

  1. 中煤科工集团重庆研究院有限公司,重庆 400037
  • 出版日期:2015-09-15 发布日期:2015-11-20
  • 基金资助:

    基金项目 国家重点基础研究发展计划(973计划)项目(编号:2013CB227904) 。

Research on Hollow Grouting Anchor Damage Law Analysis and Performance Optimization of the Key Technologies

Huang Zhongfeng   

  1. Chongqing Institute of China Coal Technology and Engineering,Chongqing 400037,China
  • Online:2015-09-15 Published:2015-11-20

摘要: 针对中空注浆锚索在高地应力软岩巷道支护过程出现的技术难题,深入探讨了中空注浆锚索的破坏机理,并对注浆锚索的承载性能进行优化,进而实现注浆与支护一体化,防止顶板事故发生。结合朱集煤矿现场调研,主要在锁具附近发生剪切破断及钢绞线与注浆体-锚固体界面发生剪切滑移而导致退锚现象等,注浆锚索破坏率达到83.4%。采用力学计算与FLAC3D数值模拟的方法分析了钢绞线与注浆浆界面的应力状态和破坏机理,得出了注浆锚索的应力公式及应力分布规律,通过模拟实验得到了注浆锚索在不同注浆效果下的应力演化特征、剪切滑移特征和极限位移量的演化特征,并提出了对注浆锚索的减压抗震装置及出浆孔位置优化的关键技术。结果表明,锚索破坏率降低至17.3%,巷道变形量得到有效控制,注浆效果得到显著改善。

关键词: 中空注浆锚索, 性能优化, 锚注一体化, 极限载荷, 减压抗震装置

Abstract: For hollow grouting anchor in the highlands stress soft rock roadway process for technical problems,Depth study of the failure mechanism of hollow grouting anchor,anchor grouting and bearing performance is optimized,thus achieving grouting and supporting the integration of the roof to prevent accidents. According to the site investigation of zhu ji mine routing anchor damage rate reached 83.4 percent,Occurs mainly in the vicinity of the shear locks and strand breakage and grout - anchor the interface shear slip phenomenon caused withdrawal anchor. Using mechanical calculations and numerical simulation method to analyze the stress FLAC3D anchor and mortar interface status and failure mechanism,Stress formula obtained grouting anchor and stress distribution,Through simulation experiments stress evolution of grouting anchor grouting under different effects,characteristics and evolution of shear slip displacement limit,And raised the pressure grouting anchor seismic devices and a slurry hole location optimization of key technologies,Field results show that the anchor damage rate decreased to 17.3%,the deformation of the roadway has been effectively controlled,grouting effect has been significantly improved.

Key words: Hollow grouting anchor cable, Performance optimization, Integrated technology of bolting and grouting, Limit load, Decompression seismic devices