矿井大型导线控制网双观测平差模型

于瑞鹏1,林卉2,丁翠3,王李娟2,孙华生4   

  1. 1.山东省第一地质矿产勘查院,山东 济南 250014;2.江苏师范大学测绘学院,江苏 徐州 221116;3.山东城市建设职业学院,山东 济南 250103;4.辽宁工程技术大学测绘与地理科学学院,辽宁 阜新 123000
  • 出版日期:2015-11-15 发布日期:2015-12-16
  • 基金资助:

    * 国家自然科学基金项目(编号:41401397,41201454),江苏省自然科学基金青年基金项目(编号:BK20140237),现代工程测量国家测绘地理信息局重点实验室项目(编号:TJES1204)。

Dual-observation Adjustment Model of Undermine Large Traverse Control Network

Yu Ruipeng1,Lin Hui2,Ding Cui3,Wang Lijuan2,Sun Huasheng4   

  1. 1.The First Institution of Geo-exploration of Shandong Province,Jinan 250014,China;2.School of Geodesy and Geomatics,Jiangsu Normal University,Xuzhou 221116,China;3.Shandong Urban Construction Vocational College,Jinan 250103,China;4.School of Geomatics,Liaoning Technical University,Fuxin 123000,China
  • Online:2015-11-15 Published:2015-12-16

摘要: 矿井导线网平差的特点是2类观测值(测角和量边)数量相当,多余观测量相对较少。为了提高矿井大型导线控制网的平差精度,根据矿井导线控制网往返观测及验后估计需要多余观测数较多的特点,提出了双观测平差模型。相对于经典平差模型,该模型条件方程个数较多,容易满足验后估计的可估条件,从而可通过后验估计合理定权来提高矿井大型导线控制网的平差精度。以某矿井大型导线控制网的实测数据为例进行了平差计算,结果显示:经典平差模型求得的3条已知边的方位角平差值与真值之差依次为-7″、-62″、-54″,而新提出的双观测平差模型所得出的平差值与真值之差依次为-10″、-12″、-15″,这说明双观测平差模型通过Helmert方差估计能够合理定权,可更准确地计算出各网点的平差值,具有一定的实用性。

关键词: 导线控制网平差, 双观测平差模型, Helmert方差估计, 精度

Abstract: The quantity of two types of observation values are closely with each other and the additional observation values is relatively few,which are the obvious characteristics of undermine transverse adjustment.In order to improve the precision and reliability of the undermine large and control network,the dual-observation adjustment model is proposed based on the characteristics of the direct and reversed observation of undermine transverse control network and the more redundant observation required by posterior estimation.Compared with the classical adjustment models,the dual-observation adjustment model is characterized by more condition equations and easier to meet the estimation condition of posterior estimation,and then the precision can be effectively improved by determining the proper weight value by using posterior estimation.Taking the measure data of the undermine large traverse control network of a mine as the research example,the adjustment calculation is conducted,the results show that the difference between the azimuth angle adjustment values of the three known sides obtained by using the classical adjustment model and the true values are -10″,-12″,-15″respectively,the differences of the adjustment values obtained by the dual-observation adjustment model proposed in this paper and the true values are -10″m,-12″,-15″respectively,it is further indicated that the dual-observation adjustment model proposed in this paper can improve the precision and reliability of the nodes of the undermine large traverse control network by determining the reasonable weight values based on Helmert variance estimation method,therefore,it has some practical value to improve the adjustment precision of the undermine large traverse control network.

Key words: Traverse control network adjustment, Dual-observation adjustment model, Helmert variance estimation, Precision