金属矿山 ›› 2015, Vol. 44 ›› Issue (11): 17-21.

• 采矿工程 • 上一篇    下一篇

露天磷矿山大型斜坡箕斗运输工艺研究

李小双1,2,李耀基1,2,王孟来1,2,朱建新3   

  1. 1.国家磷资源开发利用工程技术研究中心,云南 晋宁 650600;2.云南磷化集团有限公司,云南 晋宁 650600;3.中煤科工集团沈阳设计研究院有限公司,辽宁 沈阳 110015
  • 出版日期:2015-11-15 发布日期:2015-12-16
  • 基金资助:

    * “十二五”国家科技支撑计划项目(编号:2011BAB08B01, 2013BAB07B06),云南省科技领军人才计划项目(编号:2014HA014)。

Study on the Transport Process of Large Slope Skip in Phosphorus Open Pit Mine

Li Xiaoshuang1,2,Li Yaoji1,2,Wang Menglai1,2,Zhu Jianxin3   

  1. 1.National Engineering Research Center of Phosphate Resources Development and Utilization,Jinning 650600,China;2.Yunnan Phosphate Chemical Group Co.,Ltd.,Jinning 650600,China;3.China Sino-Coal International Engineering Group Shenyang Design and Research Institute,Shenyang 110015,China
  • Online:2015-11-15 Published:2015-12-16

摘要: 以云南磷化集团有限公司昆阳磷矿二矿区为工程背景,在进行实地调研其具体地质采矿条件的基础上,通过理论分析、现场实测以及技术经济方案可行性论证等多种研究手段,探讨了露天磷矿山的大型斜坡箕斗运输工艺。结果表明:①与传统的单斗卡车运输工艺相比,大型斜坡箕斗运输工艺具有运输成本低廉、空气与噪音污染小、能耗低的优点,在采场垂直开采深度≥85 m的深凹开采阶段具有较大优势。②大型斜坡箕斗运输工艺初期投资较大,系统相对固定,工艺环节较多,在采场垂直开采深度<85 m的浅部开采阶段具有较大的应用局限性。相关的研究成果可为该矿区或类似条件下的露天采场运输工艺提供理论和技术上的指导和参考。

关键词: 露天磷矿山, 大型斜坡箕斗运输工艺, 理论分析, 现场实测, 方案可行性, 技术经济论证

Abstract: Taking the N0.2 mining area of Kunyang phosphate mine of Yunnan Phosphate Chemical Group Co.,Ltd (YPC) as engineering background,the transport process of large slope skip in the open pit phosphorus mine was studied by various research methods such as theoretical analysis,field measurement and feasibility demonstration of technical and economic scheme,according to the field research of the specific geological and mining conditions.The results showed that:①Comparing with the traditional single bucket truck transport process,the large slope skip the transport process has the following advantages,including lower cost,less air pollution and noise pollution and lower maintenance cost.And it has a large advantage in deep concave mining stage that the stope mining vertical depth is greater than or equal to 85 m.②The large slope skip the transport process also has the following inferiors,such as larger initial investment,relatively fixed system and more complicated procedure etc..And it has a large application limitation in shallow mining stage that the stope mining vertical depth is less than 85 m.The relevant research results can provide theoretical and technical guidance and advice for the open pit transportation technology of this mining area or mining area with similar conditions.

Key words: Open pit phosphorus mine, Transport process of large slope skip, Theoretical analysis, Actual measurement, Feasibility demonstration of scheme, Technical and economic demonstration