金属矿山 ›› 2016, Vol. 45 ›› Issue (02): 17-20.

• 采矿工程 • 上一篇    下一篇

露天坑下矿柱回收的安全性分析

雷明礼1,张海磊1,赵永平2,严文炳1,柴衡山1,刘涛1   

  1. 1.西北矿冶研究院,甘肃 白银 730900;2.哈密博伦矿业有限责任公司,新疆 哈密 839000
  • 出版日期:2016-02-15 发布日期:2016-03-11
  • 基金资助:

    * 白银市科技计划项目(编号:2013-2-4G)。

Safety Analysis of Pillar Recovery under Open Pits

Lei Mingli1,Zhang Hailei1,Zhao Yongping2,Yan Wenbing1,Chai Hengshan1,Liu Tao1   

  1. 1.Northwest Institute of Mining and Metallurgy,Baiyin 730900,China;2.Hami Bolun Mining Company,Hami 839000,China
  • Online:2016-02-15 Published:2016-03-11

摘要: 某铁矿三采区一中段位于2个民采露天坑底,矿房覆岩较薄,矿柱回收存在一定风险。在充分调查该区域生产现状的基础上,利用当量暴露面积法,确定该区域矿房极限跨度为160 m,提出“隔三采二”的矿柱回收总体方案,回收矿量19.6万t。在对采空区大面积垮塌冒落的连锁效应的“矿柱失稳—应力转移”力学机理进行分析的基础上,利用Wang Jin′an顶板-矿柱流变力学模型,将三采区一中段顶板-永久间柱系统简化为由4组等效的Buegers体制成的弹性薄板,建立了矿柱-顶板系统稳定性的动态分析方法,预测了采空区的存续时间。顶板位移监测表明矿柱回采实施过程中,矿柱回采整体处于稳定阶段。实践表明:利用当量暴露面积法和Wang Jin′an顶板-矿柱流变力学模型相结合的方法确定矿房极限跨度和采空区的存续时间,具有一定的参考价值。

关键词: 矿柱回收, 采空区处理, 地压监测, 当量暴露面积, 流变力学模型

Abstract: The No.1 section of No.3 mining stope in An iron mine is located at the bottom of two open pits.For this reason,its overlying rock is thin,and there exists certain risks when implementing pillar recovery.On the basis of a full investigation on the current situation,through the equivalent exposed area method,the stope limits span is determined to be 160 m in this region.An overall pillar recovery program of 'every three mining two" has been put forward with ore capacity of 196 000 tons.Based on the disaster mechanism analysis of goaf collapse ripple effect,The Wang Jin`an roof-pillar rheological model is adopted to simplify the roof-permanent pillar system as an elastic sheet supported by four groups of Buegers body.A dynamic stability analysis system of pillar-roof is set up,and the mined-out area' survival time was predicted by this system.Roof displacement monitoring shows that pillar' stress and strain are in good condition during pillar recovery.Practice indicates that with combination of the equivalent exposed area method and the Wang Jin'an roof-pillar rheological models,it's easy to determine the stope limits span and mined-out area' survival time,with a certain reference value.

Key words: Pillar recovery, Mined-out area handling, Ground pressure monitoring, Equivalent exposed area, Rheological model