欢迎访问《金属矿山》杂志官方网站,今天是 分享到:

金属矿山 ›› 2016, Vol. 45 ›› Issue (03): 25-29.

• 采矿工程 • 上一篇    下一篇

采场结构参数及充填配比优化的FLAC3D数值模拟

刘志义1,甘德清1,薛振林1,赵海鑫1,何水清2   

  1. 1.华北理工大学矿业工程学院,河北 唐山 063000;2.西藏华泰龙矿业开发有限公司,西藏 拉萨 850200
  • 出版日期:2016-03-15 发布日期:2016-05-17

Optimization of Structure Parameters and Backfill Ratio of the Stope Based on FLAC3D

Liu Zhiyi1,Gan Deqing1,Xue Zhenlin1,Zhao Haixin1,He Shuiqing2   

  1. 1.School of Mining Engineering,North China University of Science and Technology,Tangshan 063000,China;2.Tibet Huatailong Mining Development Co.,Ltd,Lhasa 850200,China
  • Online:2016-03-15 Published:2016-05-17

摘要: 为了保证矿山安全高效开采,通过分析影响采场稳定性关键因素及破坏机理,应用数值模拟法对二步矿柱在不同结构参数和两侧不同充填配比开采条件的稳定性进行分析,优选出安全高效的一步采场充填配比和二步采场的结构参数。采用FLAC3D数值模拟,计算和分析在开采过程中,不同结构参数和两侧不同充填配比的采场顶板的应力、应力分布区域面积及位移变化特征,得出各不同方案的采场顶板稳定情况。结果表明:采场受两侧充填体配比的影响较为明显,一步采场灰砂比由1∶6改变到1∶8时,对二步采场的稳定性影响较小;灰砂比小于1∶8和采场宽度大于18 m时,采场顶板的拉应力和位移的变化率逐渐变大,采场的稳定性迅速降低。因此,综合矿山生产安全、高效及成本考虑,建议一步采场充填配比为1∶8、二步采场的宽度为18 m。

关键词: 采场结构参数, 充填配比, 稳定性, 有限元计算

Abstract: In order to ensure efficient production capacity and mining safety of the stope,3D-FEM was conducted to analyze the stability of the stope with different structure parameters and filling ratio based on the analysis of the stope-stability of the key factors and failure mechanisms,and the safe and reasonable stope parameters were selected.Stress,stress distribution area and displacement of stope roof of different structure parameters and fill ratio were calculated and analyzed to judge the stability of the stope at different conditions by adopting the FLAC3D.Result showed that,stability of stope at both sides was obviously affected by the backfill ratio.Stability of the stope was changed less when the backfill ratio varies from 1∶6 to 1∶8.The change rate of the stress and displacement of stope roof was a growing trend,and the stability of the stope was lowered when the backfill ratio was less than 1∶8 and the width of the stope was more than 18metres.So the suggested backfill ratio of the first-step stope was 1∶8,and the width of the second-step stope was 18meters based on the synthesized consideration of the safety,high efficiency and costs.

Key words: Stope structure parameters, Backfill ratio, Stability, FEM simulation