欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2017, Vol. 46 ›› Issue (10): 28-32.

• 国际矿山测量学术论坛专栏 • 上一篇    下一篇

井下等边直伸形方向附合导线优化方法及平差通用模型研究

池深深,王磊,魏涛,李楠,吕挑   

  1. 安徽理工大学测绘学院,安徽 淮南 232001
  • 出版日期:2017-10-15 发布日期:2017-10-15
  • 基金资助:

    国家自然基金项目(编号:41602357、41474026),安徽省博士后基金项目(编号:2014B019),安徽高校自然科学研究项目(编号:KJ2016A190),安徽理工大学2017年研究生创新基金项目(编号:2017CX2057)。

Research on Optimization Method and General Model of the Adjustment of the Underground Equilateral Straight-extended form of Connecting Traverse

Chi Shenshen,Wang Lei,Wei Tao,Li Nan,Lv Tiao   

  1. School of Geomatics,Anhui University of Science and Technology,Huainan 232001,China
  • Online:2017-10-15 Published:2017-10-15

摘要: 为了解决井下控制测量中陀螺仪定向边位置优化以及方向附合导线平差问题,综合运用理论研究和模拟分析方法,开展了井下等边直伸形方向附合导线优化方法及平差通用模型研究,主要获得如下结论:①基于拉格朗日乘数法讨论了等距离加测陀螺定向边为井下最优方向附合导线形式的理论依据,并进一步分析了不同贯通类型、不同定向精度时陀螺定向边加测的规律;②基于条件平差推导了井下任意条陀螺仪定向边导线平差模型,并利用模拟的方向附合导线算例验证了模型的正确性。研究成果对井下方向附合导线优化和数据处理具有重要参考价值。

关键词: 陀螺仪定向边, 方向附合导线, 平差模型, 贯通测量, 最佳加测位置

Abstract: In order to solve the problem of the optimization of the observed peg-top azimuths position and the adjustment of the direction connecting traverse,in this paper,the theory and simulation analysis method are used to carry out the research on the optimization method and the general model of the adjustment of the underground equilateral straight-extended form of connecting traverse.The main conclusions are as follows:①Based on Lagrange's extreme value method,it is proved that the equal distance is the best form to measure the observed peg-top azimuths,and obtain the law of the position of the observed peg-top azimuths with different types and different orientation accuracy.②Based on the adjustment of the condition observations,this paper establishes the model of the Direction connecting traverse adjustment of the peg-top azimuths,and verifies the correctness of the model with the simulative example of a direction connecting traverse.The results of research have important reference for the optimization of the underground direction connecting traverse connection and data processing.

Key words: Gyro orientation, Direction-connecting traverses, Adjustment model, Holing through survey, Optimal position of additional surveying