欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2017, Vol. 46 ›› Issue (10): 72-75.

• 国际矿山测量学术论坛专栏 • 上一篇    下一篇

基于无人机倾斜摄影的露天矿工程量计算方法

王果1,2,沙从术1,2,蒋瑞波1,2,郝力坤1   

  1. 1.河南工程学院土木工程学院,河南 郑州 451191;2.煤化工资源综合利用与污染治理河南省工程实验室,河南 郑州 451191
  • 出版日期:2017-10-15 发布日期:2017-10-15
  • 基金资助:

    煤化工资源利用与污染治理河南省工程实验室开放基金项目(编号:502002-B02,502002-B03),河南工程学院博士基金项目(编号:D2015040)、河南省高等学校重点科研项目(编号:18B170003)。

Research on Engineering Volume Calculation for Open-pit Mine Based on UAV oblique Photogrammetry

Wang Guo1,2,Sha Congshu1,2,Jiang Ruibo1,2,Hao Likun1   

  1. 1.Institute of Civil Engineering,Henan Institute of Engineering,Zhengzhou 451191,China;2.Engineering Laboratory of Comprehensive Coal Resource Utilization and Pollution Control in Henan Province,Zhengzhou 451191,China
  • Online:2017-10-15 Published:2017-10-15

摘要: 露天矿工程量计算是露天矿开采过程中的核心技术之一,然而露天矿几何形状由于自然条件以及采矿工艺的影响具有复杂性,工程量难以用传统的方式进行精确计算。提出一种基于无人机倾斜摄影的露天矿工程量计算方法,该方法利用无人机搭载的数码相机获取矿区序列倾斜影像,通过特征提取、空三测量、多视影像密集匹配,在获得密集点云的基础上,构建不规则三角格网和纹理映射,重建出露天矿三维模型,之后通过方格网法实现露天矿工程量计算。选取三门峡渑池某铝矿进行试验,结果表明:该方法能够实现露天矿工程量快速计算,而且具备高效低成本等特点,为复杂条件下快速计算露天矿工程量提供一种新的方法。

关键词: 无人机倾斜摄影, 露天矿, 密集点云, 方格网法, 工程量计算

Abstract: he volume calculation of open-pit mine is one of the key technologies in open-pit mining,however,the amount of engineering is difficult to be accurately calculated by traditional methods because of the complicated geometry of open pit mine influenced by natural conditions and mining process.A method for calculating the volume of open-pit mine based on tilt photography of unmanned aerial vehicle (UAV) is proposed,which adopts the unmanned aerial vehicle equipped with digital oblique cameras for image sequence acquisition in open-pit area.Through feature extraction,aerial triangulation,multi-image dense matching,3D point cloud are generated.Based on this,through irregular triangular gridding and texture mapping,3D model of open-pit slope are reconstructed automatically,and finally grid method is used for volume calculation of open-pit mine.An open-pit aluminum mine in Mianchi,Sanmenxia,is selected for experiment,and the results show that the engineering volume of open-pit can be rapidly obtained by using this method,with the characteristics of high efficiency and low cost.It provides a new method for rapid calculation of open-pit mine volume under complicated conditions.

Key words: UAV oblique photography, Open-pit mine, Dense point cloud, Grid method, Volume calculation