金属矿山 ›› 2019, Vol. 48 ›› Issue (11): 27-34.

• 采矿工程 • 上一篇    下一篇

某矿山空间交叉巷道间距优化及动力效应分析

麻栋1,石广斌1,2,李冰1,张雯1   

  1. 1. 西安建筑科技大学资源工程学院,陕西 西安 710055;2. 西安建筑科技大学土木工程学院,陕西 西安 710055
  • 出版日期:2019-11-15 发布日期:2020-01-03
  • 基金资助:

    基金项目:陕西省教育厅专项科研计划项目(编号:17JK0455)。

Spacing Optimization and Dynamic Effect Analysis of Spatial Intersection Roadway in a Mine

Ma Dong1,Shi Guangbin1,2,Li Bing1,Zhang Wen1   

  1. 1. College of Resources Engineering,Xi'an University of Architecture and Technology,Xi'an 710055,China;2. College of Civil Engineering,Xi'an University of Architecture and Technology,Xi'an 710055, China
  • Online:2019-11-15 Published:2020-01-03

摘要: 针对新建巷道与既有巷道间距较小,爆破产生的地震波会影响既有巷道初期喷混凝土结构安全与稳定的问题,以某矿山工程为背景,建立了空间交叉巷道模型,利用数值方法模拟分析新建通风巷道爆破开挖对既有运输巷道的影响。讨论不同间距、不同围岩级别条件下,新建通风巷道爆破开挖对既有运输巷道喷混凝土产生的动力效应,并结合相关工程规范,优化爆破安全间距,将优化后的结果与现场实测数据进行对比。研究表明:下部新建通风巷道爆破开挖对上部运输巷道底板及拱脚影响最大,应重点监控;巷道竖向间距小于1.5D,喷混凝土结构振速随着间距增大变化较大,反之,变化不明显,且最优爆破间距应不小于2.5D。研究成果可为现场和类似小净距巷道工程设计及施工提供参考。

关键词: 地下开采, 喷混凝土结构, 空间交叉巷道, 爆破开挖, 动力效应, 安全间距

Abstract: In the light of the small distance between the new roadway and the existing roadway, the seismic wave generated by blasting operation will affect the safety and stability of the initial shotcrete structure of the existing roadway.Thus,taking a mine project as the background, the spatial intersection roadway model is established,and the numerical method is used to imitate the influence of the blasting excavation of new ventilation roadway on existing roadway.The paper analyzes the dynamic effects of the blasting excavation of new ventilation roadway with different spacing and different surrounding rock grade on shotcrete in existing traffic roadway.Combining with the relevant engineering specifications,the blasting safety spacing is optimized and then the results are compared by field measurement.The comparison results show that the blasting excavation of new ventilation roadway at lower part has the greatest influence on arch bottom and arch foot of upper traffic roadway, and should be monitored on the key point.The vertical spacing of roadway is less than 1.5D,the vibration velocity of shotcrete structure varies greatly with the increase of spacing, and otherwise it is more than 1.5D.The change is not obvious, and the optimal blast spacing should not be less than 2.5D.The study results can provide reference for the design and construction of the site and similar roadway engineering with small clear distance.

Key words: Underground mining, Shotcrete structure, Spatial intersection roadway, Blasting excavation, Dynamic effect, Safety spacing