欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2021, Vol. 50 ›› Issue (07): 119-123.

• 矿物工程 • 上一篇    下一篇

内蒙古某金矿尼尔森重选—低氰浸出试验研究

朱一民1,2 葛文成1,2 张淑敏1,2 杨新华刘  杰1,2   

  1. 1. 东北大学资源与土木工程学院,辽宁 沈阳 110819;2. 难采选铁矿资源高效开发利用技术国家地方联合工程研究中心,辽宁 沈阳 110819;3. 山东黄金冶炼有限公司,山东 烟台 264010
  • 出版日期:2021-07-15 发布日期:2021-08-06

Nielsen Gravity Concentration Combined with Low Cyanide Leaching Test Research for a Gold Mine in Inner Mongoli

ZHU Yimin1,2    GE Wencheng1,2    ZHANG Shumin1,2    YANG Xinhua3    LIU Jie1,2   

  1. 1. School of Resources and Civil Engineering, Northeastern University, Shenyang 110819, China; 2. National-local Joint Engineering Research Center of High-efficient Exploitation Technology for Refractory Iron Ore Resources, Shenyang 110819, China; 3. Shandong Gold Smelting Co., Ltd., Yantai 264010, China
  • Online:2021-07-15 Published:2021-08-06

摘要: 内蒙古某金矿含金2.83 g/t,目前采用氰化钠浸出—树脂吸附工艺提金,浸渣总氰含量高达50 mg/kg。为降低氰化物用量,使得浸渣氰化物浓度达到充填技术标准,采用尼尔森重选—重选尾矿低氰浸出工 艺对内蒙古某金矿进行提纯试验研究,重点考察重选尾矿的磨矿细度、金欣用量、氧化钙用量、液固比及浸出时间对浸出效果的影响。结果表明:①在磨矿细度为-0.043 mm占87%、分选G值为80 G、流态化水量为3 L/min、给矿浓度为50%的条件下,采用“1粗2扫”工艺流程进行尼尔森重选,金累计回收率达到55.91%,金累计品位为35.48 g/t,重选尾矿含金1.34 g/t。②对重选尾矿进行低氰浸出条件试验,确定适宜的磨矿细度 为-0.043 mm占79%,氧化钙用量为5 kg/t,金欣用量为1 200 g/t,浸出时间为36 h,液固比为1.5 mL/g,此时金浸出率为91.88%,重选—浸出工艺流程综合回收率达96.42%;在上述条件下,采用树脂吸附处理贵液, 金吸附率为86.94%,合计重选—浸出—吸附全流程的金综合回收率为91.13%,指标良好。试验最终获得的浸渣总氰浓度为0.50 mg/kg,达到尾矿充填技术标准。

关键词: 难处理金矿石, 尼尔森重选, 低氰浸出, 金回收率

Abstract: A gold deposit in Inner Mongolia contains gold of 2.83 g/t.At present,the leaching process of sodium cyanide and resin adsorption is adopted to extract gold,and the total cyanide content in the leaching residue is as high as 50 mg/kg. In order to reduce the dosage of cyanide, Nielsen gravity separation and low-cyanide leaching process for tailings tests were conducted,so as to meet the filling technology standard. The condition including tailings grinding fineness, dosage of Jinxin and calcium oxide,the liquid-solid ratio,leaching time on leaching effect were studied. The results showed that:① Under the conditions of grinding fineness of -0.043 mm accounting for 87%,separation G value of 80 G,fluidized water flow of 3 L/min and feeding concentration of 50%, the process of "one roughing and two scavenging" was used in Nelson gravity separation.The cumulative recovery rate of gold reached 55.91% and the cumulative grade of gold was 35.48 g/t. Gold grade of gravity separation tailings is 1.34 g/t.② Low cyanide leaching conditions tests for gravity separation tailings were carried out. With the optimum grinding fineness -0.043 mm accounting for 79%,the dosage of calcium oxide of 5 kg/t,the dosage of Jinxin of 1 200 g/t,the leaching time of 36 h,the liquid-solid ratio of 1.5 mL/g,the gold leaching rate was 91.88% at this time. The comprehensive recovery rate of gravity separation and leaching process reached 96.42%. Under the above conditions, the adsorption rate of gold was 86.94% when the precious solution was treated by resin adsorption,and the comprehensive recovery rate of gold in the whole process of gravity separation, leaching and adsorption was 91.13%,indicating good indexes. The total cyanide concentration of the leaching residue was 0.50 mg/kg,which reached the technical standard of tailings filling.

Key words: refractory gold ore, Nielsen gravity concentration, low cyanide leaching, gold recovery rate