小煤柱沿空巷道围岩变形破坏特征及控制技术

刘 鑫1 李 桩1 毛金良2   

  1. 1.国能神东煤炭集团有限责任公司,内蒙古 鄂尔多斯 017200;2.中国煤炭科工集团太原研究院有限公司,山西 太原 030006
  • 出版日期:2025-11-15 发布日期:2025-12-01
  • 通讯作者: 李 桩(1988—),男,高级工程师。
  • 作者简介:刘 鑫(1986—),男,高级工程师。
  • 基金资助:
    山西省重点研发计划项目(编号:202202020101005)。

 Deformation and Failure Characteristics of Surrounding Rock in Roadways Along Small Coal Pillars and Associated Control Techniques

 LIU Xin1 LI Zhuang1 MAO Jinliang2   

  1. 1.Guoneng Shendong Coal Group Co.,Ltd.,Ordos 017200,China; 2.China Coal Technology & Enginecring Group Taiyuan Research Institute Co.,Ltd.,Taiyuan 030006,China
  • Online:2025-11-15 Published:2025-12-01

摘要: 随着煤矿开采强度增加,采掘比例失调导致的采掘接替紧张问题日益突出,频繁的开采活动使得巷道 围岩遭受严重破坏,而小煤柱沿空巷道作为采前掘进巷道,其稳定性直接关系到井下作业的安全性和围岩稳定性控 制效果。为提高井下作业的安全性与巷道稳定性,提出了一种基于切顶卸压的小煤柱沿空巷道围岩变形控制技术。 通过分析小煤柱沿空巷道围岩变形破坏特征,对小煤柱沿空巷道顶板进行控制。研究表明:使用切顶卸压的小煤柱 沿空巷道围岩变形控制技术表现出了良好性能,当无切顶卸压时顶板的最大应力为25.7 MPa时,进行切顶卸压的顶 板应力为9.6 MPa,顶板应力降低了62.6%;当无切顶卸压时煤柱帮最大应力为19.9 MPa时,进行切顶卸压的煤柱帮 应力为4.4 MPa,煤柱帮应力降低了77.9%。研究反映出所提切顶卸压控制方法能有效减小顶板和煤柱帮的应力,进 而使得围岩破坏范围最小,对于保障小煤柱沿空巷道作业过程安全具有重要意义。

关键词: 沿空巷道 切顶卸压 变形控制 小煤柱 围岩稳定性

Abstract: With the increase of coal mining intensity,the problem of tight mining succession caused by the imbalance of mining proportion has become increasingly prominent.Frequent mining activities have caused serious damage to the surround ing rock of the roadway.As a pre mining excavation roadway,the stability of small coal pillar goaf roadway directly affects the safety of underground operations and the control effect of surrounding rock.In order to improve the safety and stability of under ground mining operations,a deformation control technology for surrounding rock of small coal pillar goaf based on top cutting and pressure relief is proposed.By analyzing the deformation and failure characteristics of the surrounding rock along the small coal pillar goaf,the roof of the small coal pillar goaf is controlled.Research has shown that the deformation control technology of small coal pillars along the empty roadway using top cutting and pressure relief has shown good performance.When there is no top cutting and pressure relief,the maximum stress on the roof is 25.7 MPa.The stress on the roof after top cutting and pres sure relief is 9.6 MPa,and the roof stress is reduced by 62.6%;When the maximum stress of the coal pillar without top cutting and pressure relief is 19.9 MPa,the stress of the coal pillar with top cutting and pressure relief is 4.4 MPa,and the stress of the coal pillar is reduced by 77.9%.The research reflects that the proposed top cutting and pressure relief control method can effectively reduce the stress on the roof and coal pillar support,thereby minimizing the damage range of the surrounding rock, which is of great significance for ensuring the safety of small coal pillar goaf operations.

Key words: along the empty roadway,top cutting and pressure relief,deformation control,small coal pillars,rock stability

中图分类号: