金属矿山 ›› 2025, Vol. 54 ›› Issue (6): 11-19.

• 采矿工程 • 上一篇    下一篇

基于改进收敛—约束法的大断面硐室永久支护时机研究

董亚宁1 金爱兵2 靳 群1 刘 康1 邱英明2 陈帅军2
  

  1. 1. 安徽马钢矿业资源集团姑山矿业有限公司钟九矿业分公司,安徽 马鞍山 243111;
    2. 北京科技大学资源与安全工程学院,北京 100083
  • 出版日期:2025-06-15 发布日期:2025-07-08
  • 作者简介:董亚宁(1966—),男,首席工程师,高级工程师。
  • 基金资助:
    国家自然科学基金项目(编号:52174106)。

Study on Permanent Support Timing of Large Section Chamber Based on ImprovedConvergence-Constraint Method

DONG Yaning 1 JIN Aibing 2 JIN Qun 1 LIU Kang 1 QIU Yingming 2 CHEN Shuaijun 2   

  1. 1. Zhongjiu Mining Branch,Anhui Masteel Mining Resources Group Gushan Mining Co. ,Ltd. ,Maanshan 243111,China;
    2. School of Resources and Safety Engineering,University of Science and Technology Beijing,Beijing 100083,China
  • Online:2025-06-15 Published:2025-07-08

摘要:

合理的支护时机对维护巷道围岩稳定、保障矿山生产安全具有重要作用。 以钟九铁矿卸载硐室作为工
程背景,考虑临时支护作用,基于收敛—约束法对永久支护时机(临时支护而无永久支护区域长度 ΔL)的范围进行了
初步选择,突破了传统收敛—约束法仅能应用于无临时支护巷道的支护时机确定;进一步通过 FLAC 3D 数值模拟分析
了围岩应力、位移与塑性区变化趋势,得到了最佳的永久支护时机;并根据现场监测结果评价围岩支护效果,验证了
永久支护时机选取的合理性。 结果表明:临时支护结构对围岩特征曲线和围岩纵剖面变形曲线求解结果有一定的影
响,考虑临时支护后的巷道围岩最大变形量为 666. 86 mm;永久支护时机不同时,围岩—支护结构所产生的压力和变
形也不同,随着 ΔL 增大,围岩—支护结构的压力和位移分别呈减小和增大趋势;通过计算永久支护结构所能承受的
最大围岩压力得到 ΔL>1. 07 m,通过地应力释放率得到 ΔL = 8. 50 m,结合数值模拟确定永久支护时机为 6 m;实际监
测数据显示卸载硐室顶底板和帮部位移量分别达 84. 73 mm 和 190. 82 mm,硐室围岩表面位移在可控范围内,支护效
果较好。 研究可为相关巷道永久支护时机的确定提供理论和实践借鉴。

关键词:

Abstract: Reasonable support timing plays an important role in maintaining the stability of roadway surrounding rock and ensuring the safety of mine production. Taking the unloading chamber of Zhongjiu Iron Mine as the engineering background, considering the effect of temporary support,the range of permanent support timing ( temporary support without permanent support area length ΔL) was preliminarily selected based on the convergence-constraint method,which broke through the traditional convergence-constraint method. It can only be applied to the determination of support timing for roadways without temporary support. Furthermore,the variation trend of stress,displacement and plastic zone of surrounding rock is analyzed by FLAC 3D numerical simulation,and the best permanent support time is obtained. According to the field monitoring results,the support effect of surrounding rock is evaluated,and the rationality of the selection of permanent support time is verified. The results show that the temporary support structure has a certain influence on the solution results of the surrounding rock characteristic curve and the longitudinal section deformation curve of the surrounding rock. The maximum deformation of the surrounding rock of the roadway after considering the temporary support is 666. 86 mm. When the timing of permanent support is different,the pressure and deformation of surrounding rock-support structure are also different. With the increase of ΔL,the pressure and displacement of surrounding rock-support structure decrease and increase respectively. By calculating the maximum surrounding rock pressure that the permanent support structure can withstand,ΔL>1. 07 m is obtained. Through the in-situ stress release rate,ΔL =8. 50 m is obtained. Combined with numerical simulation,the timing of permanent support is determined to be 6 m. The actual monitoring data show that the displacement of the roof and floor and the side of the unloading chamber is 84. 73 mm and 190. 82 mm,respectively. The surface displacement of the surrounding rock of the chamber is within the controllable range,and the supporting effect is good. The research can provide theoretical and practical reference for the determination of the permanent support time of related roadways.