欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2013, Vol. 42 ›› Issue (01): 15-19.

• 采矿工程 • 上一篇    下一篇

灵乡铁矿残留点柱回收与采空区稳定性分析

王纪鹏,欧阳治华,刘夏临,李苗   

  1. 武汉科技大学资源与环境工程学院
  • 出版日期:2013-01-15 发布日期:2013-01-23

Analysis on Recovery of Residual Point Pillars and Stability of Mined-out Areas in Lingxiang Iron Mine

Wang Jipeng,Ouyang Zhihua,Liu Xialin,Li Miao   

  1. College of Resources and Environmental Engineering,Wuhan University of Science and Technology
  • Online:2013-01-15 Published:2013-01-23

摘要: 针对灵乡铁矿拟回采采空区内部分点柱对空区上覆岩层和地表设施的影响,采用有限元法对其回采过程进行了模拟,揭示了回采过程中点柱的应力变化规律及顶板的应力分布变化,证明了回采工作的可行性。结合回采过程中应力变化,建议采用方案二进行回采是比较安全的,同时建议在2号、5号点柱上布置声发射监测点。

关键词: 采空区, 点柱回收, 数值模拟, 声发射监测

Abstract: In view of the influence of the recovery of residual point pillars at mined-out areas on the overlying strata and surface facilities in Lingxiang Iron Mine,the stoping process of the residual point pillars were simulated with FEM,indicating the stress change law and stress distribution of roof and verifying the feasibility of the recovery.According to the stress variety in the stoping process,it is recommended that the second stoping scheme be a lot safer and AE monitoring points be laid out at No.2 and No.5 pillars.

Key words: Mined-out areas, Recovery of point pillars, Numerical simulation, AE monitoring