欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2013, Vol. 42 ›› Issue (10): 47-49.

• 采矿工程 • 上一篇    下一篇

某大高度富水硐室底板砂浆锚索施工实践

郭成钺   

  1. 山西高河能源有限公司
  • 出版日期:2013-10-15 发布日期:2014-01-02

Practical Construction of Floor Mortar Anchor in Large Height Rich-water Chamber

Guo Chengyue   

  1. Gaohe Energy Limited Company of Shanxi
  • Online:2013-10-15 Published:2014-01-02

摘要: 为了确保某大断面富水硐室可长期使用及经受后期采动影响,针对现场硐室底板渗水严重及水泥砂浆锚固性能不足,提出了水泥端锚全长砂浆锚索施工方式,数值模拟研究了锚网索底板支护对支护承载结构的影响,得出底板锚网索能改善底板弯矩分布并提高底板承载结构的稳定性。实践表明:底板锚索合格率达到了97%,所述施工方式可有效解决类似条件下底板锚索由于水及施工高度太高带来的施工难题。

关键词: 大断面硐室, 锚网索, 承载结构, 水泥端锚

Abstract: In order to ensure that a large section of rich water chamber can be used for a long time or hold the late impacts of mining,and for serious water seepage of the chamber floor and bad anchoring performance of cement mortar,the wholly mortar cable construction method with the cement end anchor is proposed.The numerical simulation is made to study the impact of cable anchor plate support to supporting bearing structure.It is obtained that the bottom cable anchor can improve the distribution of plate's bending moment and the stability of floor load-bearing structure.The practice shows that: the bottom cable pass rate reached 97% and the construction method can effectively solve the difficulties in construction of the bottom anchor under similar conditions due to rich water and high construction height.

Key words: Large-section chamber, Cable anchor, Bearing structure, Cement end anchor