自然风压和活塞风影响下的会宝岭铁矿斜坡道污风治理

赵文彬1,徐凯1,史俊文2,胡冰2   

  1. 1.山东科技大学矿业与安全工程学院,山东 青岛 266590;2.山东省临沂矿业集团会宝岭铁矿,山东 临沂 276017
  • 出版日期:2017-07-15 发布日期:2017-09-13

Ramp Ventilation Governance of Huibaoling Iron Mine Under the Influence of Natural Wind Pressure and Piston Wind

Zhao Wenbin1,Xu Kai1,Shi Junwen2,Hu Bing2   

  1. 1.School of Mining and Safety Engineering,Shandong University of Science and Technology,Qingdao 266590,China;2.Huibaoling Iron Mine,Shandong Province Linyi Mining Group,Linyi 276017,China
  • Online:2017-07-15 Published:2017-09-13

摘要: 针对会宝岭铁矿斜坡道在夏季存在严重的污风积聚问题,为了及时将积聚在斜坡道中的污风排出,分别取当地全年温度最低和最高月份1月和7月中的某一天为样本,通过测算一天中矿井自然风压大小,建立自然风压在一天中的变化曲线图,得出7月15∶00左右自然风压最低,此时矿井通风最困难,斜坡道处的污风积聚最严重。通过现场测算,1月和7月斜坡道联通-410 m水平联络巷处的风量大小分别为6.9 m3/s 和2.3 m3/s,结合斜坡道受运输矿车造成的活塞风影响,考虑通风困难时期在斜坡道与-130 m水平的联络巷处安设风幕装置,计算阻风率为31%。运用Ventsim软件对矿井通风系统进行风路解算,得出斜坡道在-410 m水平联络巷处的风量为7.5 m3/s,优于冬季通风最容易时期的风量。现场应用表明,该风幕装置运行效果良好。

关键词: 斜坡道, 污风处理, 自然风压, 活塞风, 风幕

Abstract: In view of the serious phenomenon of ramp dirty wind accumulation in summer in Huibaoling Iron Mine,in order to effectively eliminate the dirty wind accumulated in ramp,taking one day of January (with minimum temperature) and July (with maximum temperature) of the area the iron mine is located as the study example respectively,based on measuring the mine nature wind pressure value of the day,the variation curve of wind pressure of the day is obtained,the analysis results show that the natural wind pressure is lowest at about 15:00 in July,which show that the mine ventilation is difficult at this time,the accumulation phenomenon of dirty wind in ramp is more serious.Through on-site measurement,the air volume of the connection roadway of -410 m level and ramp in January and July are 6.9 m3/s,2.3 m3/s respectively.Combing with the influence of piston wind caused by colliery tub on ramp,the wind curtain device is installed in the connection roadway of -130 m level and ramp in ventilation difficult period,the choke rate is 31%.The mine ventilation system is calculated based on Ventsim software,the results show that the wind volume of the connection roadway at -410 m level of ramp is 7.5 m3/s,which is superior to the one of winter when the mine ventilation is easy.The actual application results show that the operation effect of the wind curtain device is good.

Key words: Ramp, Dirty wind processing, Natural wind pressure, Piston wind, Wind curtain