[1] |
HAN Xin, NIE Wen, WANG Yunmin, ZHANG Shaoxuan, ZENG Xia, RUI Yueji, WANG Yulian, DAI Bibo, WANG Xing, XIE Wei, NI Tianhua, FAN Tingyu, WANG Xingming, XU Liangji.
Research on the Coupling and Coordinated Development of Mineral-Economy-Ecological Environment
System in the Yangtze River Economic Belt
[J]. Metal Mine, 2024, 53(3): 249-.
|
[2] |
WANG Yongzhi, CHEN Yuliang, XIE Minmin, YU Mengrou, HU Xiaoyu, WANG Baojuan.
3D Training Image Construction Method for Reserve Calculation of Mineral Resources
[J]. Metal Mine, 2023, 52(05): 247-253.
|
[3] |
LI Haiquan, XIA Lin, HUANG Kun, LIU Peng.
Development Practice of 3D Collaboration Platform of Geology, Survey and Mining on Zijinshan Gold & Copper Mine
[J]. Metal Mine, 2021, 50(09): 169-176.
|
[4] |
ZHAO Yabei, SHI Jianxin, SU Yankun.
Construction of the Metallogenic Prediction System of a Gold Mining Area in Henan Province Based on ArcGIS
[J]. Metal Mine, 2020, 49(11): 191-196.
|
[5] |
SONG Jian, TANG Chun-An, KANG Fang-Chao.
Synergetic Mining Mode of Deep Mineral and Geothermal Resources
[J]. Metal Mine, 2020, 50(05): 124-131.
|
[6] |
LI Hai-Gang, LI Shi-Jie, ZHENG Xiao-Long, LIU Zhou-Chao, YAN Lei.
Study on Synergetic Mining Technology of Residual Ore under Hidden Influence of Goaf
[J]. Metal Mine, 2020, 50(05): 26-33.
|
[7] |
DUAN Shao-Shuai, HUANG Xi-Feng, WU Yong-Jiang.
International Cooperation Community Mode of Mineral Resources in Shaanxi Province Under the Background of “The New Silk Road”
[J]. Metal Mine, 2017, 46(05): 7-13.
|
[8] |
WANG Rui, LIN Min, LU Zhi-Gang.
Development of the Mining Surface Subsidence Early Warning Information System of a Iron Mine Based on VB
[J]. Metal Mine, 2016, 45(10): 136-141.
|
[9] |
LIU De-Yuan, SUN Xin-Hua, HE Sheng-Dong, ZHANG Zhuo-Ran.
MapGIS Method of Mining Subsidence Prediction of Dahongshan Mining Area
[J]. Metal Mine, 2016, 45(09): 157-160.
|
[10] |
LIU Qing-Na, WANG Pan-Fei, QU Pei-Chen, XU Yong-Jun, YOU Chun-An.
Automatically Making System of Soft Rock Roadway Support Design
[J]. Metal Mine, 2015, 44(11): 124-127.
|
[11] |
DU Jiu-Sheng, WANG Li, HOU Zheng, CHEN Yi-Jin.
Design and Realization of Database for Open-pit Truck Dispatching System
[J]. Metal Mine, 2015, 44(09): 105-111.
|
[12] |
JIAN Run-Tang, YANG Fan, WANG Yan-Mei, HAN Yan-Wei.
Reserve Estimation and Establishment of Three-dimensional Geological Model of Bairong-Gangjiang Cu(Mo) Deposit,Tibet
[J]. Metal Mine, 2015, 44(09): 95-99.
|
[13] |
JING Yong-Bin, DAI Bi-Bo, SUN Guang-Zhong.
Techniques for Three-dimensional Modeling and Visualizing of Borehole Data
[J]. Metal Mine, 2015, 44(06): 98-102.
|
[14] |
YU Niu-Ben, QI Wen-Tao, WANG Li-Huan, MU He-Ta-尔·Zha-Ri, LI Gang.
Three-dimensional Geological Modeling and Reserve Estimation Based on 3DMine Software: Taking a Well Field of Balikun Mining Area,Xinjiang as an Example
[J]. Metal Mine, 2015, 44(03): 138-142.
|
[15] |
WU An-Bing, GUO Ke, LIU Bing-Li.
Evaluation of Geological Exploration of Mineral Resources Based on Gray-Fuzzy Theory: A Case Study in Central Tibet
[J]. Metal Mine, 2015, 44(03): 133-137.
|