[1] |
LI Yang, XIA Wenhao, SONG Weidong, KANG Mingchao, DU Yunlong, ZHANG Kaicheng.
Stability Evaluation of Seabed Mining and Treatment Based on Multi-source Information Fusion
[J]. Metal Mine, 2024, 53(3): 29-.
|
[2] |
YANG Feng, WANG Liang, GUO Qingbiao, AN Zhansheng.
Study on the Stability Evaluation of the Mianluan Expressway Construction Site on the Goaf
[J]. Metal Mine, 2022, 51(11): 198-207.
|
[3] |
HAN Chongchong, TAN Yuye, CHEN Diyun, QI Wei, SONG Weidong.
Multi-attribute Decision Optimization and Practice of Mining Method in High Altitude Area Based on Variable Weight Theory
[J]. Metal Mine, 2022, 51(09): 9-17.
|
[4] |
YANG Xiangsheng, GUO Guangli, GUO Song, GUO Baode, LIU Zan, WANG Yuezong.
Site Stability Evaluation of High Voltage Transmission Lines Based on Improved Fuzzy Analytic Hierarchy Process
[J]. Metal Mine, 2022, 51(01): 231-236.
|
[5] |
JIANG Ren-Wei, TAN Shu-Cheng.
Study on the Geological Environmental Bearing Capacity of Baimahongge Mining Area Based on GIS
[J]. Metal Mine, 2019, 48(05): 170-176.
|
[6] |
WU Li-Jun, HAN Xiao-Liang, LIU Bai-Pu.
Mining Method Optimization of Sharply-inclined Thin Orebody of a Tungsten Mine
[J]. Metal Mine, 2018, 47(12): 34-38.
|
[7] |
ZHOU Sheng, YANG Cheng-Xiang, HU Hui-Shu, CHEN Ping, LEI Ding-Ding, LI Guang-Ze, JIANG Wei.
Research and Practice on Optimization of Waste Dump Engineering of Mirador Copper Mine
[J]. Metal Mine, 2018, 47(10): 167-171.
|
[8] |
DONG Long-Bin, WANG Shao-Quan, ZHANG Hua, ZHOU Yu, HE Xiang.
Optimization of Stope Span Parameters of One-step Mining with Consideration of Multi-factor
[J]. Metal Mine, 2018, 47(10): 31-35.
|
[9] |
LIU Heng-Liang, ZHANG Qin-Li, RONG Shuai.
Optimization of Mining Method Based on Game Theory and Improved TOPSIS
[J]. Metal Mine, 2017, 46(06): 8-13.
|
[10] |
CHEN Xin-Zheng, YANG Xiao-Cong, GUO Li-Jie, LI Zong-Nan.
Orthogonal Experimental Study on Optimal Matching Scheme for Backfilling
[J]. Metal Mine, 2016, 45(11): 16-20.
|
[11] |
SUN Xiao-Yu, ZHAO Song-Song.
Comprehensive Evaluation Method for Truck Dispatching System in Open-pit Mine
[J]. Metal Mine, 2016, 45(05): 139-143.
|
[12] |
SUN Shi-Guo, SU Zhen-Hua, ZHANG Ying-Hai.
GIS-based Approach of Rock Slope′s Stability Assessment under Multiple Factors
[J]. Metal Mine, 2016, 45(05): 42-47.
|
[13] |
ZHAO Jin-Xian, SUN Jing-Han, FAN Ke, LI Chuan-Lin, WANG Yong-Zeng.
Optimization of Stable Transition Program during Deep Mining Expansion of Qidashan Iron Mine
[J]. Metal Mine, 2016, 45(05): 15-18.
|
[14] |
SUN Guang-Hua, WEI Sha-Sha, SU Dong-Liang.
Optimal Matching Scheme for the Full Tailings-Cemented Filling Based on the Orthogonal Experiment
[J]. Metal Mine, 2015, 44(04): 111-113.
|
[15] |
WU An-Bing, GUO Ke, LIU Bing-Li.
Evaluation of Geological Exploration of Mineral Resources Based on Gray-Fuzzy Theory: A Case Study in Central Tibet
[J]. Metal Mine, 2015, 44(03): 133-137.
|