[1] |
ZHAO Jia-Zheng, LI Ning, YE Hai-Wang, WANG Li-Guan, WANG Qi-Zhou, LEI Tao.
Synergetic Optimization Study of Open Pit Truck Shovel Based on Extended Summation Algorithm of Closed Queuing Network
[J]. Metal Mine, 2020, 50(05): 151-157.
|
[2] |
Gu-Qing-Hua, 吕Yan-Hong, Lu-Cai-Wu, Ruan-Shun-Ling.
Modeling and Algorithm of Multi-objective Production Scheduling Optimization for Multi-metal Open-pit Mine
[J]. Metal Mine, 2020, 49(04): 147-153.
|
[3] |
XIANG Juan, CHEN Zhan-Feng, FAN Wen-Chen.
Stability Analysis of Lakeside Open-pit Slope in Chengmenshan Copper Mine by Considering Seepage Influence
[J]. Metal Mine, 2019, 48(01): 163-167.
|
[4] |
SUN Guang-Lin, HU Jiang-Chun, BIAN Ya-Dong, TAO Zhi-Gang, LIANG Ming-Xing.
Research and Application of Open Pit Slope Shallow Surface Nondestructive Detection Technology
[J]. Metal Mine, 2018, 47(04): 58-62.
|
[5] |
ZHANG Lin.
Technical Progress and Development Trend of Open Pit Mining in Metal Mines of China
[J]. Metal Mine, 2016, 45(07): 20-25.
|
[6] |
DENG Wen-Xue, YANG Tian-Hong, 南Shi-Qing , SONG Bin-Bin.
Determination of Mechanics Parameters of Rock Mass in Sijiaying Iron Mine East Slope and Its Stability Analysis
[J]. Metal Mine, 2016, 45(03): 15-19.
|
[7] |
HAN Xin-Ping, WU Chong, WANG Ming-Jun.
Design of Intelligent Blasting System in Open Pit Mine Based on Internet of Things
[J]. Metal Mine, 2015, 44(04): 250-254.
|
[8] |
ZHANG Bing-Tao, LIU Yan-Zhang, LI Hai-Long, ZHANG Qun, LU Pei-Pei, LIU Wei.
Study on Dynamic Reclamation Mode of Chaoguo Open Pit Mine
[J]. Metal Mine, 2015, 44(04): 61-65.
|
[9] |
XU Li-Sheng, DAI Bi-Bo, JIANG Peng-Fei.
3D Visualization Programming Process of Production Plan Scheduling for Open Pit Mine
[J]. Metal Mine, 2014, 43(01): 20-24.
|
[10] |
KANG Rui-Fang, WANG Chang-Jun, FAN Jian-Wei, XIE Xing, XING Hong-Yu, YU Rui.
Study on Deformation Monitoring and Fracture Characteristics of High-steep Slope in Nanfen Open-pit Mine
[J]. Metal Mine, 2013, 42(01): 38-41.
|
[11] |
HUANG Wei-Qiang.
Application of Footwall Benchless Slope Mining Method in Xinqiao Open-pit Mine
[J]. Metal Mine, 2012, 41(02): 30-32.
|
[12] |
DIAO Hu.
Numerical Simulation Analysis of the Interaction of a Mine in the Process of Open-pit Underground Combined Mining
[J]. Metal Mine, 2012, 41(01): 22-27.
|
[13] |
DUAN Yu-Xian, JING Shi-Gun.
The Optimization of Vehicle Scheduling in Sandaozhuang Open Pit Based on Immune Algorithm
[J]. Metal Mine, 2011, 40(08): 131-133+139.
|
[14] |
JIANG Quan, CHEN Jian-Hong, YANG Hai-Yang.
Study on Open Pit Limit Optimization Based on DIMINE Software System
[J]. Metal Mine, 2010, 39(09): 13-17,37.
|
[15] |
LIU Li-Feng, ZHU Ming, YUE Xin, ZHU Kai-Yu, PENG Ji-Huan.
Application of Neural Network in Analyzing Open-pit Slope Stability
[J]. Metal Mine, 2008, 38(09): 38-39+56.
|