Metal Mine ›› 2013, Vol. 42 ›› Issue (05): 37-40.

Previous Articles     Next Articles

Discussion on Haulageway Transition by Stages Boundary in Nanfen Open Pit Iron Mine

Fan Lijun,Zeng Pengyi,Sun Dianxing   

  1. Nanfen Open-pit Iron Mine
  • Online:2013-05-15 Published:2013-06-08

Abstract: During the transition of the mining by stages and by divisions in Nanfen open-pit iron mine,aiming at the problems of the slope rolling stone's constraints and haulageway transition,it's very necessary to adjust the elevation and height of cutting the rolling stones platform.The platform of the wall pushback transition is designed to the transitional haulagway,which is verified by the method of making up the digging schedule plan in order to achieve the goal of safety production and smooth and steady wall pushback transition in Nanfen open-pit iron mine.Meanwhile,the short distance highway transportation is formed with the consumption of trucks fuel lowered,the additional operating costs reduced and the economic benefits of the mine enhanced.

Key words: Open-pit mine, Haulageway, Wall pushback transition, Stages boundary