Metal Mine ›› 2013, Vol. 42 ›› Issue (07): 20-23.
Previous Articles Next Articles
Zhang Wentao,Chen Qunzhong,Li Aijun,Lei Xiliang,Dai Zidong
Online:
Published:
Abstract: Taking the open-off cut in 21208 working face of Chensilou Coal Mine as example, and according to the actual geological conditions of the working face, the once-tunneling construction technology of the large cross-section open-off cut in full-mechanized face is studied. The study provides a reference for other mines under similar condition by summarizing the advanced methods and successful experience.
Key words: Fully-mechanized face, Open-off cut, Large cross-section, Once-tunneling, Equipment installation
ZHANG Wen-Tao, CHEN Qun-Zhong, LI Ai-Jun, LEI Xi-Liang, DAI Zi-Dong. Once-tunneling Construction Technology of Large Cross-section Open-off Cut in Fully-mechanized Face[J]. Metal Mine, 2013, 42(07): 20-23.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2013/V42/I07/20