[1] |
GE Yong-Xiang, ZHANG Cong-Rui, WANG Wei, LEI Gao, REN Gao-Feng, WU Qi.
Study on the Stability of Interval Pillar Recovery under the Complex Backfilling Body in Sanxin Gold and Copper Mine
[J]. Metal Mine, 2018, 47(12): 27-33.
|
[2] |
JIA Han-Wen, ZHOU Ya-Bo, LIU Long, LIU Xi-Ge, YAN Bao-Xu.
Research of Mining Method for Recovering Cap Pillar of Goaf at 728 m Level in A′erhada Pb-Zn Mine
[J]. Metal Mine, 2018, 47(01): 42-46.
|
[3] |
YE Guang-Xiang, WANG Liu, ZHANG Shu-Biao, JIANG Yong-Heng, YE Ji-Huan.
Study on the Safe Recovery Technique of Pillars of Complicated Multi-layer Goafs
[J]. Metal Mine, 2017, 46(06): 61-65.
|
[4] |
LEI Ming-Li, ZHANG Hai-Lei, ZHAO Yong-Ping, YAN Wen-Bing, CHAI Heng-Shan, LIU Tao.
Safety Analysis of Pillar Recovery under Open Pits
[J]. Metal Mine, 2016, 45(02): 17-20.
|
[5] |
WANG Qing-Yuan, ZHU Wan-Cheng, LIU Kai, HOU Chen.
Mining Method Optimization for Recovering Crown Pillar in Xincheng Gold Mine Based on Catastrophe Progression Method
[J]. Metal Mine, 2015, 44(12): 24-28.
|
[6] |
LIU Wu-Tuan, ZHAO Kui, HU Jing-Tao, RAO Zhao-Xun, LIU Ming-Rong.
Stability of Pillars Recovery in an Iron Ore
[J]. Metal Mine, 2014, 43(08): 162-165.
|
[7] |
MA Xiong-Zhong, WANG Wen-Jie, MA Sheng-Hui.
Study on Spacer Pillar Stoping and Goaf Stability Numerical Simulation of Fozi Mine
[J]. Metal Mine, 2014, 43(02): 22-25.
|
[8] |
GUAN Kai, ZHU Wan-Cheng, ZHANG Hong-Xun, WANG Qing-Yuan, WEI Chen-Hui.
Optimization of Panel Mining Sequence for the Middle-section Top Pillar of Xincheng Gold Mine
[J]. Metal Mine, 2013, 42(09): 44-49.
|
[9] |
XIANG You-Bing, TAN Wei, ZHAO Kang, WANG Xiao-Jun.
Research on the Stability of Artificial Pillar with Similar Simulation Experiment
[J]. Metal Mine, 2013, 42(06): 31-34.
|
[10] |
GUO Wei, ZHANG Chuan-Xin, ZHAO Ji-Yin.
Numerical Simulation Research on Pillar Stope Stability Under High Stress Conditions in Big Panel
[J]. Metal Mine, 2013, 42(05): 27-30.
|
[11] |
ZHANG Fei, WANG Bin, GONG Zhi-Zhong, CUI Zhi-Ping, LIU Wen-Gang, JI Jie.
FLAC3D-based Numerical Simulation Analysis on the Sequence of Pillar Recovery
[J]. Metal Mine, 2013, 42(02): 10-13.
|
[12] |
ZHANG Hong-Xun, WANG Qing-Yuan, ZHU Wan-Cheng, JIANG Jin-Bao, SHA 鸥, ZHU Zhao-Wen.
Mining Method for Recovering Crown Pillar at -580 m Level of Ⅴ# Orebody in Xincheng Gold Mine
[J]. Metal Mine, 2012, 41(12): 1-4+13.
|
[13] |
HU Dao-Xi, YIN Bao-Chang.
Pillar Recovery Technology Research in a Iron Mine
[J]. Metal Mine, 2012, 41(08): 19-20+24.
|
[14] |
FEI Hong-Lu, YANG Wei-Feng, ZHANG Guo-Hui-.
Numerical Simulation on the Stability of Surrounding Rock under the Goaf of Cemented Tailings Backfilling Content
[J]. Metal Mine, 2012, 41(07): 19-22.
|
[15] |
YAO Nan, ZHOU Wei.
Discussion on Second-step Pillar Recovery Mining Method of Wuji Iron Mine(North Section)
[J]. Metal Mine, 2011, 40(10): 55-57+60.
|