[1] |
ZHANG Guo-Qiang, XU Zhi-Hong, WU Li-Huo.
Study on the Relationship Between Production Capacity and Rock Drilling Operation in an Underground Metal Mine
[J]. Metal Mine, 2018, 47(11): 49-52.
|
[2] |
ZHONG Chang-Yun, WANG Hong-Jiang, LING Xue-Qin.
Regression Analysis of Empirical Formula of Reciprocating Diaphragm Pumping Power
[J]. Metal Mine, 2016, 45(06): 134-138.
|
[3] |
BAI Run-Cai, DONG Rui-Rong, LIU Guang-Wei, LIU Chuang.
Research on Application Conditions and Mining Parameters of Surface Miner
[J]. Metal Mine, 2016, 45(01): 136-141.
|
[4] |
GAO Shi-You, CAI Qing-Xiang, LI Jia-Bin, ZHOU Wei, LIU Yun-Xiao, WANG Jin-Hui.
Study on Development Principle of Multiple Resources Opencast Engineering
[J]. Metal Mine, 2016, 45(01): 17-20.
|
[5] |
SU Hong-Rui.
Pre-control under the Top to Medium-depth Hole-by-hole Detonation Technology of Mining
[J]. Metal Mine, 2015, 44(05): 52-53.
|
[6] |
LI Hong-Jie, LI Ling, LI Jian, JIANG Peng, SHU Zong-Yun.
Discussion on the Methods for Determining the Height of Fractured Water-conducting Zone
[J]. Metal Mine, 2015, 44(04): 1-6.
|
[7] |
WANG Wei, LI Yun-An, WANG Qin-Gang, HU Li-Zhen, LEI Yin, ZOU Ji-Tao.
Analysis of Surface Deformation Caused by Upward Horizontal Slicing and Filling Stoping Method
[J]. Metal Mine, 2014, 43(08): 139-142.
|
[8] |
LIU Wei-Tao, HUO Zhi-Chao, PAN Xiao-Feng, HUANG Rui-Feng.
Reasonable Preserve of Waterproof Pillar nearby the Thin Bedrock Efflorescent Oxygenized Belts
[J]. Metal Mine, 2014, 43(02): 154-158.
|
[9] |
CHANG Jun, SHANG Tao, FANG Jian, SUN Yu-Ting.
Analysis on Damage Factors for Surface Miner
[J]. Metal Mine, 2014, 43(01): 112-115.
|
[10] |
SUN Kuan, LI Xin, HAN Liu, ZHOU Wei, DENG You-Ran.
Comparative Research on Composite Cutting Trajectory of Surface Miners
[J]. Metal Mine, 2013, 42(10): 101-105.
|
[11] |
ZHAO Hong-Ze, ZHANG Rui-Xin, ZHEN Xuan, XUE Wan-Hai, YAN Ning.
Study of Production Capacity Constraint Index in Coal Mine From Flat Seam to Inclined Seam
[J]. Metal Mine, 2012, 41(09): 16-20.
|
[12] |
XIAO Shuang-Shuang, LI Ke-Min, LI Tao, MA Li, CHANG Zhi-Guo.
Prediction of Dragline's Production Capacity Based on BP Neural Network
[J]. Metal Mine, 2012, 41(05): 41-43.
|
[13] |
WU Chang-Zhen, DAI Jian-Yong, YANG Shi-Jiao.
Optimized Configuration of Mechanical Equipment in Open-Pit Mines Based on the Compound Interest Method
[J]. Metal Mine, 2011, 40(04): 108-110.
|
[14] |
WANG Jie, YANG Chao, ZHANG Jun, WANG Hong-Wu.
Calculation Method of the Resistance Loss in Pipeline Transportation of Paste Filling Slurry
[J]. Metal Mine, 2010, 39(12): 33-36.
|