Metal Mine ›› 2014, Vol. 43 ›› Issue (08): 24-28.

Previous Articles     Next Articles

Optimization of Ore Caving Distance in Mining Stope of Danyin Gold Mine

Lin Jia1,Zhao Weihao2,Zhang Fengpeng1   

  1. 1.Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines,Shenyang 110819,China;2.Dandong Danyin Mining Co.,Ltd.,Dandong 118107,China
  • Online:2014-08-15 Published:2015-03-31

Abstract: In overall mining methods,the stability of the roof is very important,which can directly affect the mining operation proceed.Based on the actual situation of No.2608 mining stope in Danyin gold mine,the ore caving distance at the mining stope is optimized.A proper caving distance can guarantee mining work processed smoothly,and also improves the mining efficiency.FLAC3D is adopted to establish the model of the mining room.The raise tunneling is carried out firstly,and then moved along with the ore vein,The stresses of roof at 2 m,3 m,4 m,are analyzed to get the stress distribution and stress concentration area.It is concluded that 3m is the best distance of ore caving.The research result provides a scientific basis to the actual production of the mine.

Key words: Overall mining method, FLAC3D, Numerical simulation, Excavation